Similar Projects
Green Bay Boiler Replacement
Bidding
$166,000 est. value
Madison, WI

Underground Heating Pipe Repair
Infrastructure, Alteration
Bidding
$204,600 est. value
Stanley, WI 54768

Replace Boilers B415
Post-Bid
$10,000,000 to $20,000,000 est. value
Tomah, WI 54660

Boiler Replacement
Post-Bid
Milwaukee, WI 53207

Air Handling Unit Replacement
Results
$240,000 est. value
Barron, WI 54812

Steam Heat Exchanger Replacement
Results
Less than $185,000 est. value
Fox Lake, WI 53933

Northwest Restroom Facility MEP
Renovation, Alteration - 3,500 SF
Bidding
$2,336,300 est. value
West Allis, WI 53214

High Speed Rubberized Garage Doors
Term Contract
Post-Bid
Milwaukee, WI 53205

Boiler Replacement at Brewster Village
Results
Appleton, WI 54914

Boilers and Installation of Boilers
Alteration
Bidding
Madison, WI 53705

Mechanical Ventilation Installation And Electrical Repair
Renovation
Post-Bid
Waukesha, WI 53146

Air Compressor Replacement
Results
Less than $50,000 est. value
Madison, WI 53703

Boiler Replacement - Arlington Research Station
Alteration
Bidding
$263,450 est. value
Arlington, WI 53911

Plasma Disinfection Modifications
Post-Bid
Waukesha, WI 53146

Domestic Water Heater Replacement
Results
Less than $190,000 est. value
Madison, WI 53703

Last Updated 01/11/2022 01:13 PM
Project Title

Airport Gate Operator Gate No. 35

Physical Address View project details and contacts
City, State (County) Janesville, WI 53546   (Rock County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The gate operator shall be a Linear Model VS-GSLG with appropriately sized motor and single phase 240 voltage. No other brands. 1. The slide gate operator shall use a microprocessor based solid-state control board that controls all functions of the slide gate operator. Operator shall be rated for continuous duty for use in commercial and industrial maximum-security applications and supplied with a heating unit for its proper operation during winter conditions. 2. Motor shall be directly coupled to the primary gear reduction system. 3. Primary reduction and power transfer shall be provided by a heavy-duty worm gear running in a continuous oil bath. 4. Operator limit switches shall be internally driven and shall not be accessible, easily tampered with or activated from outside the operator cabinet. 5. Pulling medium shall provide a positive mechanical connection to the gate system. Friction driven rail type pulling mediums shall not be allowed. Roller chain pulling medium shall be minimum size #50. 6. Operator shall function as a fail-secure device and shall provide a positive gate lock without the need of additional hardware or equipment. 7. Operator shall be capable of being mounted at the front, center, or rear of the gate system, shall be designed for either left- or right-hand mount and shall be designed for pad or pedestal mounting. 8. Operator housing shall use 12-gauge G90 galvanized steel to avoid rusting and shall be painted charcoal gray. 9. Two (2 safety edge bumpers. 10. Two (2) Vehicle Loop Detectors. 11. Removal of existing rollers and installation of four (4) new rollers. 12. The gate shall be provided with one (1) digital keypad entrance controller with a 4-digit access code, Linear AK-1 or approved equal. The unit shall be manufactured by Linear Access Key (760) 438-7000. 1. Replace existing keypad and wire from operator to keypad. 2. Existing gooseneck pedestal will remain in place.

Details

Division 26 - Electrical.
Division 32 - Exterior Improvements, Fences and Gates, Gate Operators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents