Similar Projects
Benjamin Franklin Elementary School Air-Conditioning
Alteration
Bidding
$400,000 est. value
Meriden, CT 06451

John Barry Elementary School Air-Conditioning
Alteration
Bidding
Meriden, CT 06451

City Hill Middle School (CHMS) Replacement of 3 AHU/CU's
Post-Bid
Naugatuck, CT 06770

City Hill Middle School (CHMS) Replacement of Electric Duct Heaters
Post-Bid
Naugatuck, CT 06770

Furnish and Install Replacement of a Trane Roof Top Model WSC090E4RKA 7.5 Ton Roof Top Unit
Results
Wallingford, CT

HVAC Upgrades at Derby High School
Results
Derby, CT 06418

Roger Sherman Elementary School Air-Conditioning
Alteration
Bidding
$400,000 est. value
Meriden, CT 06450

HVAC and Mechanical Products
Term Contract
Post-Bid

Installation of Heat Pump and Air Conditioning System at 32 Hillside Avenue
Results
Waterbury, CT 06710

Casimir Pulaski Elementary School Air-Conditioning
Alteration
Bidding
$400,000 est. value
Meriden, CT 06450

J045--VISN 1 - Pipe-Steam Fitting 5-Year Pop Agreement
Post-Bid
Newington, West Hartford, West Haven, CT - Bedford, Boston, Brockton, Northampton, MA - Augusta, ME 06516

Replacement HVAC Unit at Parks and Recreation
Results
Wallingford, CT 06492

Nathan Hale Elementary School Air-Conditioning
Alteration
Bidding
$400,000 est. value
Meriden, CT 06450

045--Chilled Water Line Repair
Post-Bid
West Haven, CT 06516

Air Conditioning Upgrade Server Room at the Police Department
Results
Waterbury, CT 06702

Reported 04/13/2022 12:00 AM
Project Title

Ductless A/C Split System for the Forensic Lab at the Police Department

Physical Address View project details and contacts
City, State (County) Waterbury, CT 06702   (New Haven County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install (1) Ductless A/C Split System in the Digital Forensic Lab at the Waterbury Police Station, 255 East Main Street. Specifications: Provide (1) complete Daikin 3 Ton Ductless A/C Split System with low ambient control to operate to -10 deg F or lower temperature. The system shall have a wall mounted indoor unit. . The system shall have a remote outdoor wall mounted condensing unit. Location to be determined by owner. Provide remote or wired thermostat for the system. Refrigerant line sets shall be run above finished ceiling. All core boring and penetrations shall be included in this scope of work. All penetrations to be sleeved and fire caulked as required. All electrical line and low voltage shall be included and coordinated with the customer. Provide condensate piping as required to location to be determined by owner. All work shall be coordinated with the owner. Provide all permits and fees. Pressurize, leak test, evacuate and charge systems. Start and test equipment as required. On completion of satisfactory startup of equipment, provide owner training of system operation. Provide owner 2 sets of owner manuals. Provide 1 year parts and labor warranty.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents