Similar Projects
Amherst Public School Addition
New Construction, Renovation, Addition - 64,300 SF
Conception
$9,100,000 est. value
Amherst, NE 68812

Improved Football Field & New Fieldhouse
New Construction
Conception
$7,800,000 est. value
Grand Island, NE

North Star High School Renovations
Renovation
Design
Lincoln, NE 68501

Science Room Renovation
Renovation
Design
Hastings, NE

Winside Public Schools Addition and Renovation
Renovation, Addition - 33,800 SF
Bidding
Winside, NE 68790

Construction Managers At Risk For The City Of Kearney Indoor Sports Complex
New Construction - 215,000 SF
Bidding
Kearney, NE

New Gretna High School 2
New Construction
Post-Bid
Omaha, NE 68136

New Northwest, Southeast High School
New Construction
Post-Bid
Lincoln, NE

N.P. Dodge Park Athletic Fields
Renovation
Results
Omaha, NE

Public Improvements for Ashland-Greenwood Public School
Renovation
Results
Ashland, NE 68003

College of Saint Mary Wellness and Athletic Center
New Construction - 82,000 SF
Construction
$18,000,000 est. value
Omaha, NE

Middle School and Performing Auditorium
Construction
Ashland, NE

Kearney Indoor Sports Facility
New Construction - 210,000 SF
Pending Verification
$30,000,000 to $32,000,000 est. value
Kearney, NE

Lutheran High Northeast New Agriculture, Science Additions
Addition - 15,000 SF
Pending Verification
$3,000,000 to $4,000,000 est. value
Norfolk, NE 68701

The Intersections Sports Fitness & Rehabilitation Facility
New Construction
Conception
Omaha, NE 68105

Last Updated 03/21/2022 01:40 PM
Project Title

Dawes Middle School

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68504   (Lancaster County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work will include the construction of an approximate 11,405 sq ft gym,fitness and multipurpose room addition and renovations to the existing Dawes Middle School at 5130 Colfax Ave, Lincoln, NE. Specific construction activities will include: Grading work, site utilities, concrete slab on grade construction, concrete footings, masonry and metal stud bearing walls with brick veneer, steel joists, metal roof deck, modified bitumen roofing, wood gym flooring, rubber flooring, gyp board, tile, acoustical ceilings, paint, Tectum wall panels, aluminum entrance framing, translucent wall assemblies, HVAC well field and ground source heat pump systems, plumbing, power and lighting systems.

Details

Athletic Facility, Approximately 11,405 SF Addition, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents