Similar Projects
Community Center
Renovation - 56,000 SF
Conception
$300,000 est. value
Pittsburgh, PA 15214

Frosty Valley Professional Building
New Construction
Conception
Pittsburgh, PA 15241

South Side Marina Clubhouse and Office
New Construction - 14,000 SF
Design
Pittsburgh, PA 15203

Hawkins Village - Phase 1
New Construction - 71,585 SF
Sub-Bidding
$18,000,000 est. value
Rankin, PA 15104

Moose Lodge Demolition
Demolition - 9,000 SF
Post-Bid
Elizabeth, PA 15037

Holy Family Institute Main Building Roof Replacement
Renovation
Post-Bid
Pittsburgh, PA 15202

Wilmerding Community Center Improvement
Results
Less than $75,000 est. value
Wilmerding, PA 15137

Richland Concessions - General Construction
New Construction
Results
Gibsonia, PA 15044

Foxwood Trail - Phase I
New Construction
Construction
$13,000,000 est. value
Cheswick, PA 15024

Foxwood Trail - Phase II
New Construction
Construction
Cheswick, PA 15024

SouthSide Works - Container Park
New Construction
Conception
$50,000,000 est. value
Pittsburgh, PA 15203

Best of the Batch - Clubhouse
New Construction - 26,683 SF
Construction
$7,600,000 est. value
Homestead, PA 15120

Seabright Development
New Construction
Conception
Noblestown, PA 15071

St. Clair Country Club Pool Facilities
Renovation
Construction
Pittsburgh, PA 15241

Stanwix Street Rooftop Amenity Addition
Renovation, Addition - 6,255 SF
Conception
Pittsburgh, PA 15222

Last Updated 06/01/2021 10:54 AM
Project Title

Lodge

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15212   (Allegheny County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method
Project Status Construction Commenced October 2018, Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Interior and exterior renovations, rear addition to existing structure.

Details

Clubhouse/Social Club, 5 Stories Above Grade, 20,000 SF Renovation.
Division 02 - Existing Conditions.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents