Similar Projects
New Booster Pump Station for SF/150 - Catawba County
New Construction
Conception
$1,600,000 est. value
Newton, NC

Lift Station Renovations - Town of Morehead City
Renovation
Conception
$1,050,000 est. value
Morehead City, NC

The Copper District Phase II - Force Main Project
New Construction
Design
Clayton, NC

Pump Station Replacements and Sanitary Sewer Improvements
Demolition, New Construction, Infrastructure
Design
$4,800,000 CJ est. value
Wadesboro, NC 28170

Clinton Waste Water Treatment Plant Resiliency Improvements
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Clinton, NC 28328

Hammocks Beach State Park Mainland Development Phase 1 - Camground Improvements
New Construction, Infrastructure
Bidding
$2,020,000 CJ est. value
Swansboro, NC 28584

Sewer Pump Station No. 1 Improvements
Post-Bid
$524,959 est. value
Walnut Creek, NC 27534

Design Build Services for Mott`s Creek Pump Station Upgrades
New Construction
Post-Bid
Less than $5,900,000 est. value
Wilmington, NC 28412

Wastewater Pump Station and Sewer System Improvements
Results
Grifton, NC 28530

Pump Station #34 and #35 Aesthetic Improvements
Results
$195,000 to $200,000 est. value
Wilmington, NC 28403

Northern Regional Pump Stations and Force Mains, Phase B
Infrastructure
Pending Verification
$1,535,750 CJ est. value
Wilmington, NC 28403

East Raleigh Wastewater Conveyance - City of Raleigh
Addition, Demolition, Infrastructure
Pending Verification
$96,000,000 CJ est. value
Raleigh, NC 27601

Dixie Berryhill Water and Sewer Projects - City of Charlotte
New Construction, Infrastructure
Conception
$3,920,000 est. value
Charlotte, NC

Middle Creek - Sunset Hills Pump Station Renovation - Town of Apex
Renovation, Infrastructure
Design
$3,510,000 CJ est. value
Apex, NC 27540

Township 7 Sewer Improvement Phase III Contract I & II
Infrastructure
Bidding
$800,000 CJ est. value
New Bern, NC 28562

Last Updated 10/21/2022 07:39 AM
Project Title

RFQ D/B - Pump Station Rehabilitation Shamrock Pump Station-33 Suncourt Villas Pump Station-114

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28403   (New Hanover County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $825,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 3, 2022, this project is in the conceptual phase. A D/B firm has not been selected. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: RFQ-Design Build Services for Pump Station Rehabilitation- Shamrock Pump Station-33 and Suncourt Villas Pump Station-114 General Cape Fear Public Utility Authority (CFPUA) was created in 2008 to provide high-quality water and wastewater for the nearly 200,000 customers who live in New Hanover County. CFPUA owns, operates, and maintains the public water distribution and wastewater collections systems including two water treatment plants, two wastewater plants, elevated water tanks, well sites, pump stations, and several thousand miles of water and sewer lines. Scope of work The project scope of work generally includes, but is not limited to the following primary tasks: Preliminary Engineers Report/ Design memorandum Existing asset evaluation Subsurface utility engineering Geotechnical engineering and testing Validation of project site conditions Design of the project Cost estimating and reporting Lifecycle cost analysis Permitting Construction Closeout (punch list documentation and resolution, O&M manuals, systems and equipment training, as-built documentation, final inspection, and acceptance.) Project commissioning Project acceptance testing The SOQ shall include a one-page cover letter plus a maximum of thirty-five (35) pages to address the SOQ criteria specified in Section 3 (excluding Resumes and Subconsultant/Subcontractor Selection Plan). Table of Contents and section divider pages do not count toward the total page count. Resumes for each key team member shall be limited to no more than two pages. Resumes and Sub-consultant/Subcontractor Selection Plan shall be attached as Appendix A. It is the submitting firms' responsibility to confirm that CFPUA has received statement of qualifications via email. If email reply is not received from bids@cfpua.org, please call 910-332-6472 or 910- 332-6589 before deadline for submission. Failure to comply with the following criteria may be grounds for disqualifications: Receipt of submittal by the specified cut-off date and time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents