Last Updated 07/22/2021 07:00 AM
Project Title

Construction of Harvest Townside Phase 3 Utilities

Physical Address View project details and contacts
City, State (County) TX   (Denton County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in Belmont Fresh Water Supply District No. 2in Denton County, Texas. The site may be reached from Interstate Highway 35W by traveling north to the FM-407 exit.Exit FM-407 and turn left,heading west. Continue heading west for approximately 0.3 miles and turn right onto Harvest Way heading north. Continue heading north for approximately 1.6 miles.After 1.6 miles, Harvest Town side Phase 3 will be to the west of Harvest Way just before the road becomes Briar wood Road.The project consists of approximately 5,100 LF sanitary sewer, 5,600 LF of water, and 2,400 LF of storm sewer for 99 residential lots.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents