Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

River Point Riverbank Project
Infrastructure
Bidding
$240,000 CJ est. value
Manitowoc, WI 54220

Drilling a New Well at Cleveland Town Hall
Infrastructure
Bidding
$300,000 CJ est. value
Cleveland, WI 53015

Playground Equipment for Parks Rebid
Infrastructure
Sub-Bidding
$170,000 CJ est. value
Manitowoc, WI 54220

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Lincoln Park Tennis Court Resurface Project
Infrastructure
Bidding
$50,000 CJ est. value
Manitowoc, WI 54220

IDIQ Contract for Architect-Engineer Services for Compliance with Air Emission Regulations, EPCRA Regulations, Greenhouse Gas & All Other Environmental Media Regulations
Post-Bid

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Post-Bid
$10,000 to $300,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

C1JZ--National Region AE IDIQ
Post-Bid
$20,000,000 est. value

Remove and Replace Existing Sidewalks
Results
Manitowoc, WI

Last Updated 08/02/2022 06:04 PM
Project Title

NOI RFP Engineering - Green Bay - Manitowoc

Physical Address View project details and contacts
City, State (County) Reedsville, WI 54230   (Manitowoc County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Engineering, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 2, 2022, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to April 2023. *The closed solicitation has been included below for reference: Solicitation ID: BHM-02 Anticipated Construction Cost: $14,000,000-$14,999,999 The rest areas need to be replaced to meet current needs. Replace both the Rest Area 51 Maribel and Rest Area 52 Denmark facilities along I-43 in Manitowoc County. Each of the sister sites includes: total razing and construction of a new building, parking lots (for both autos and commercial truck & RV parking), increasing the size of truck parking and investigating alternative fuel options. Advertised Fixed Fee %: 7.75 DBE goal on project: No The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will be conducted. Questions are provided below. At least eight (8) business days before the interview, short-listed firms will be provided specific interview time and location. Interview Date: 05/04/2022 Interview Place: Hill Farms State Office Building; 4822 Madison Yards Way; Madison, WI 53705 The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Green Bay - Manitowoc *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents