Similar Projects
Sullivan - Concord (CTH F) Const OPS / Pavement Resurface
Infrastructure
Design
$2,000,000 CJ est. value
Sullivan, WI 53178

Sullivan - Concord (CTH F) Const OPS / Pavement Resurface
Infrastructure
Design
$2,000,000 CJ est. value
Sullivan, WI 53178

Fort Atkinson - Whitewater, CTH M - Buckingham Road
Infrastructure
Bidding
$6,000,000 CJ est. value
Fort Atkinson, WI 53538

Fort Atkinson - Whitewater, CTH M - Buckingham Road
Infrastructure
Bidding
$6,000,000 CJ est. value
Fort Atkinson, WI 53538

Road Projects
Post-Bid
WI

2021 Conservancy Place Site Work
Infrastructure
Post-Bid
Jefferson, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Air Park Drive LRIP
Results
Watertown, WI 53094

Interurban Trail - Phase 2 - Paving
Infrastructure
Post-Bid
Jefferson, WI

Interurban Trailhead - Site Work
Results
$45,000 est. value
Watertown, WI 53094

Gravel and Seal Coating, Crack Sealing
Infrastructure
Post-Bid
Waterloo, WI

Chip Sealing
Results
WI

C. Fort Atkinson, Robert Street, Rock River Bridge, B-28-0009
Infrastructure
Post-Bid
$2,000,000 to $2,999,999 est. value
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

2022 Road Bids
Infrastructure
Post-Bid
$76,000 est. value
Waterloo, WI

Last Updated 08/22/2022 08:04 AM
Project Title

Construction at Watertown Municipal Airport

Physical Address View project details and contacts
City, State (County) Watertown, WI 53094   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $251,016 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 12, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** **As of July 08, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** As of June 15, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Crack seal, micro-surfacing, slurry leveling, and pavement marking Estimate of major quantities: 86,200 sy micro-surface, 12,500 lb crack seal, 18,080 sf pavement marking DBE Goal: 4.71% Contract Completion Time: October 31, 2022 Cost to bid: There are two options for bidders to submit bids: A cost of $35 per project, or a monthly subscription wherein the bidder is able to submit bids for all projects in bidexpress.com system for $50 per month. Subscriptions can be turned on and off at any time by the registered user. Only the prime or general contractor submitting a bid are responsible for payment. Proposal guaranty: A bid security in the amount of 5% of the total amount of the bid is required for the contract. Each proposal must be accompanied by a bid bond, certificate of annual bid bond, a certified check, bank's draft, bank's check, or postal money order made payable to the Wisconsin Department of Transportation Secretary for 5% of the total amount bid. The electronic template will allow the following options for meeting the proposal guaranty. E-Verify bid bond (Surety2000 & SurePath), uploading a copy of the bid bond or certificate of annual bid bond, certified check, bank draft, or money order. Any bid security, other than a E-verified bond or certificate of annual bid bond is provided, the department will require that the apparent two lowest bidders to mail or hand-deliver the original bond, certified check, bank draft, or money order to the Bureau of Aeronautics by close of business two business days following the close of bids and must be received by the Bureau of Aeronautics no later than 5 days from the posting of the bid results. Bid proposals will be opened only from those firms that have established their qualifications for the work being bid upon. If a prospective bidder has previously submitted hold a current and valid (not expired or revoked), proper statement and received prior approval from the department, a re-submittal for this project is not required. The qualification statement is a sworn statement and consist of information relating to financial ability, equipment, and experience in the work prescribed in this proposal. The statement shall be in writing on the proper standard form furnished by the department. The department will evaluate the statement and determine acceptability prior to bid acceptance. Failure to establish prequalification as stipulated will result in the bid not being opened and/or rejected. Federal Requirements: This project is federally funded and federal provisions and requirements apply. Federal provisions made part of, but not limited to this contract include: Buy American Preference, Federal Tax Certification, Foreign Trade Restriction, Davis Bacon, Affirmative Action, Governmentwide Debarment and Suspension, Governmentwide Requirements for Drug-free Workplace. Hours of labor and minimum wage rates: Pursuant to regulations provided by applicable federal and/or state laws, the hours of labor and minimum wage rates are set forth in the proposal. Affirmative action: The department hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. Affidavit of non-collusion: A required affidavit of non-collusion will be incorporated as part of the proposal for each prospective bidder. Failure to complete and sign the sworn statement makes the bid nonresponsive and ineligible for award consideration. By completing the electronic signature and submitting the proposal, each bidder by or on behalf of the person, firm, association, or corporation submitting the bid, certifies that such person, firm, association, or corporation has not, either directly or indirectly, entered into agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid. This sworn statement shall be executed and sworn to by the bidder before a person who is authorized by the laws of the state to administer oaths.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents