Similar Projects
Administration Building Parking Lot Work
Infrastructure
Bidding
Rochester, MI

2021 Safety Path Program
Infrastructure
Bidding
Bloomfield Hills, MI 48301

BP 6 Birney Parking Lot and Track Field
Post-Bid
Southfield, MI 48076

CDBG ADA Sidewalk Ramp Installation
Post-Bid
Milford, MI

Rest Areas and Welcome Centers Across the State
Term Contract
Results

OCC Southfield Parking Lot Repairs
Results
Southfield, MI 48075

2020 Safety Path Program
Post-Bid
MI

Innovation Hills Kayak Landing
Results
Rochester Hills, MI 48309

Rest Area ADA Improvement Eastern Lower Peninsula
Post-Bid

Municipal Parking Lot Maintenance Contract
Results
Less than $50,000 est. value
Novi, MI

Bike Racks for Sidewalks
Post-Bid
Wixom, MI

OCC Auburn Hills M-TEC Parking Lot
Results
Auburn Hills, MI 48326

Woodland Elementary Sidewalk Replacement
Post-Bid
Auburn Hills, MI

FY 2019 CDBG Sidewalk Ramp Improvements
Results
Less than $36,785 est. value
Clawson, MI

Rest Area ADA Improvement Eastern Lower Peninsula - Interior
Post-Bid

Last Updated 08/26/2021 12:16 AM
Project Title

2021 Concrete Sidewalk Program

Physical Address View project details and contacts
City, State (County) Birmingham, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include an replacement of various sidewalk and curb sections within the downtown area total area of downtown sidewalk replacement is estimated to be 1,200 square feet, and approximately 100 squard yards of roadway concrete replacement, and approximately 500 square feet of exposed aggregate concrete. This work includes an estimated 1,000 linear feet of sawcutting and 250 linear feet of curb replacement. The city also plans to replace sidewalk sections to eliminate trip hazards in section 4 of the city/neighborhoods. An estimate of 7,500 Square feet of sidewalk and drive approaches will be replaced. Additionally our sidewalk program will be replacing ADA ramps with an estimated 7,000 square feet of concre, 200 square feet of detetable warning plates. Roadway painting will be included in this project, 4 in striping white and blue 1,500 linear feet, 200 square feet of 24" crosswalk pain, and approximately 750 square feet of topsoil and mulch, this project will also have approximately 200 ton of HMA patching at varied thicknesses.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents