Similar Projects
DISD - MLK Arts Academy - Phase IIi
Renovation - 60,000 SF
Conception
$4,000,000 est. value
Dallas, TX 75215

Phase 4 School Bond Renovation
New Construction, Renovation, Addition
Conception
Arlington, TX

Western Academy Gymnasium
New Construction - 9,122 SF
Design
$2,000,000 est. value
Houston, TX 77080

Highlands High School Athletic Facilities Renovations
Renovation
Design
$40,411,569 est. value
San Antonio, TX 78210

Two New Facilities
New Construction
Bidding
Moody, TX

Maintenance and Construction Building Addition and Renovation
Renovation, Addition
Bidding
$800,000 est. value
Humble, TX 77396

2019 Bond Construction and Renovation Projects
Renovation
Post-Bid
Less than $11,000,000 est. value
Moulton, TX 77975

Founder's Classical Academy of Prosper
Post-Bid
Prosper, TX 75078

Katy ISD Kitchen Renovations and Floral Cooler Additions at Multiple Campuses
Renovation, Addition
Results
Less than $3,036,000 est. value
Katy, TX 77494

Concession-Restroom Building ADAPT
New Construction
Results
El Paso, TX 79932

Cristo Rey Dallas College Preparatory School Innovation Center
New Construction - 40,000 SF
Construction
$13,000,000 est. value
Dallas, TX 75217

Founders Classical Academy of Flower Mound High School
New Construction - 33,872 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Flower Mound, TX 75028

Newman Smith High School
Renovation - 75,000 SF
Pending Verification
$22,900,000 est. value
Carrollton, TX 75006

Lake Highlands Junior High School Renovations
Renovation
Pending Verification
$70,000,000 est. value
Dallas, TX 75238

Barrow Transportation Facility Update
Renovation
Conception
$1,600,000 est. value
Frisco, TX 75033

Reported 09/16/2021 04:40 PM
Project Title

Construction Manager at Risk

Physical Address View project details and contacts
City, State (County) Tuscola, TX   (Taylor County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced second quarter 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Intermediate School $15,830,250 12/2020 – 08/2022; Middle School – Renovate Science Lab in Functional Lab $175,172 12/2020 – 08/2021; Middle School – Convert Old Home Economics Classrooms into Two New Classrooms $118,200 12/2020 – 08/2021; Middle School – Kitchen & Cafeteria Expansion $2,433,228 03/2021 – 11/2022; High School – North Academic Addition $2,045,029 10/2021 – 04/2023; High School – Campus Circulation & Paving Improvements $860,822 01/2021 – 08/2021; High School – Locker Room Expansion & Circulation Improvements $1,026,054 10/2021 – 12/2022; High School – New Entrance Facilities $501,168 10/2021 – 12/2022; New Career Tech Facility $2,773,251 07/2021 – 06/2023; New Fine Arts Facility $7,808,967 10/2021 – 04/2024

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents