Similar Projects
IH 41 - IH 43 Const / Resurf Mill / Overlay
Infrastructure
Conception
$15,000,000 CJ est. value
Ashwaubenon, WI 54304

IH 41 - IH 43 Const / Resurf Mill / Overlay
Infrastructure
Conception
$15,000,000 CJ est. value
Ashwaubenon, WI 54304

2022 Sidewalk & Parking Lot Improvements
Infrastructure
Design
$805,551 CJ est. value
Ashwaubenon, WI 54304

2022 Sidewalk & Parking Lot Improvements
Infrastructure
Design
$805,551 CJ est. value
Ashwaubenon, WI 54304

Security Fence
Infrastructure
Bidding
$100,000 CJ est. value
Green Bay, WI 54301

Midway Road Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Rockland, WI 54115

IH 43, City of Green Bay, Leo Frigo Bridge
Infrastructure
Sub-Bidding
$6,000,000 CJ est. value
Green Bay, WI 54302

Experience Greater Green Bay Visitor Center
New Construction, Infrastructure - 12,566 SF
Sub-Bidding
$6,500,000 CJ est. value
Green Bay, WI 54304

Crackfilling
Post-Bid
De Pere, WI

Culvert Replacement and Hot Oil Chip Sealing
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Sewer and Water Relay and Street Resurfacing
Results
De Pere, WI

Shawano - Green Bay Constr Ops / Misc Fencing
Infrastructure
Design
$2,000,000 CJ est. value
Green Bay, WI 54301

Double Face LED Lit Cabinet Sign
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Pulaski, WI 54162

Chambers Hill Farm 1st Addition Roadway
Post-Bid
Suamico, WI

Last Updated 08/15/2022 02:11 PM
Project Title

RFP Engineering - Rehabilitation - Intersection improvement

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54302   (Brown County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Commissioning, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The intersections will be modified to improve roadway operations. Rehabilitation/Highway Safety Improvement Project of 1.6 miles of STH 57 extending approximately 2,000' south and 2,000' north of the CTH H intersection (0.80 miles) and approximately 1,500' south and 1,500' north of the Stone Road intersection (0.80 miles) in the towns of Brussels and Nasewaupee in Door County. Intersections will be converted to Restricted Crossing U-Turn intersections (RCUT's, aka J-turns). Offset right turn lanes will also be included. Left in movements will be allowed. Extended turn lanes will be included at the Stone Road intersection due to the close proximity of the local high school and higher truck traffic Anticipated Construction Cost: $2,000,000-$2,999,999 Advertised Fixed Fee %: 7.25 DBE goal on project: No The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultants actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Rehabilitation - Intersection improvement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents