Similar Projects
Carkeek CSO Dechlorination System Replacement
Alteration
Design
$860,000 est. value
WA

BRPS Fish Counting Systems
Alteration
Design
$750,000 est. value
WA

South Plant Essential Services Standby Generator Replacement - Rebid
Renovation
Sub-Bidding
$40,000 CJ est. value
Renton, WA 98057

Jail Kitchen Equipment Replacement
Renovation
Sub-Bidding
$425,000 CJ est. value
Tacoma, WA 98402

Tractor With Snowplow and Mower
Alteration
Post-Bid
WA

Howard A. Hanson Dam (HAHD) Emergency Gate Stoplog and Hoist Replacement
Demolition, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Ravensdale, WA 98051

Marine Cell Fender Procurement Berth 17
Infrastructure
Results
$176,250 to $194,785 est. value
Vancouver, WA 98687

115Kv Circuit Breakers
Alteration
Results
WA

Brps Fish Counting Systems
Term Contract
Design
$750,000 est. value
WA

Wastewater Treatment Plant Thickening Equipment Services
Alteration
Post-Bid
Bonney Lake, WA 98391

Handrail Repair Services
Alteration
Results
WA

Spokane Airport Board - Fuel Control Facility Metering Upgrade
Renovation
Design
$70,000 CJ est. value
Spokane, WA 99224

Water System Backup Generator Purchase
Term Contract
Post-Bid
$194,750 to $215,250 est. value
Vancouver, WA

Airport Road Recycling and Transfer Station Scale Replacement
Infrastructure, Alteration
Results
$700,000 est. value
Everett, WA

CEMS Sample Line 180' Roll; Dekoron Unitherm
Alteration
Post-Bid
$13,000 est. value
Spokane, WA

Last Updated 03/20/2023 05:10 PM
Project Title

Pullman-Moscow Regional Airport Terminal Relocation/Replacement - Bid Package: #5 - Kitchen Equipment

Physical Address View project details and contacts
City, State (County) Pullman, WA 99163   (Whitman County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $49,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Lump sum pricing is requested for the Work in strict accordance with Division 01 - General Requirements, the Contract documents and this Request for Proposals. Incomplete proposals will not be considered. As used herein, "provide" shall mean "furnish and install". Except as otherwise noted, Work will be awarded to the responsible bidders submitting the lowest responsive bids A BID BOND in the form of a surety bond, cashier's check or certified check in an amount equal to five percent (5%) of the bid must be attached to bids in excess of three hundred thousand dollars ($300,000). BID BOND shall be payable to Hoffman Construction Company of Washington. Bond may be faxed providing the original Bid Bond is delivered no later than the next business day. Failure to provide BID BOND with bid shall render bid non-responsive Bidders must be licensed with Washington State Department of Labor and Industries at the time of submission of their bids. Contact Washington State Department of Labor and Industries (Internet http://www.lni.wa.gov) for additional information. Question Deadline 03/13/2023 Technical Questions & Substitution Requests: Technical questions and substitution requests must be SUBMITTED IN WRITING (No Telephone Calls, please) to: David Shourd E-mail: David-Shourd@Hoffmancorp.com

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents