Similar Projects
Sugar Creek Charter School Expansion
New Construction
Conception
Charlotte, NC 28213

Coastal Christian School Music Addition
Addition - 4,600 SF
Design
Wilmington, NC 28409

M15 Fuquay-Varina Middle School
Renovation
Design
Fuquay-Varina, NC

Highlander Academy
Renovation
Bidding
Red Springs, NC 28377

Macon Middle School Locker Room Facility
Renovation
Bidding
Franklin, NC 28734

New Middle School
New Construction
Sub-Bidding
$30,000,000 est. value
Jefferson, NC

New Olympic Relief High School
New Construction - 315,000 SF
Post-Bid
Charlotte, NC 28200

Wiley Magnet Middle School Interior Upfit and Gymnasium Addition
Post-Bid
Winston-Salem, NC 27104

Additions to Swain County High School
Addition
Results
NC

Construction of Innovation Academy
New Construction
Results
Smithfield, NC 27577

New Northern High School Replacement
New Construction - 278,613 SF
Construction
$51,250,000 est. value
Durham, NC 27704

New Robinhood Road Middle School
New Construction
Construction
Winston-Salem, NC

Rosman Middle School
Renovation, Addition
Pending Verification
Rosman, NC 28772

H12 New High School
New Construction
Design
Less than $152,291,274 est. value
Apex, NC 27539

Ocracoke School Replacement Building
Renovation
Bidding
Ocracoke, NC

Reported 06/24/2021 12:00 AM
Project Title

Brevard High School

Physical Address View project details and contacts
City, State (County) Brevard, NC 28712   (Transylvania County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

Pre-qualify Contractors to submit bids for furnishing labor, materials, tools & equipment. Brevard High School consists of two buildings/additions (totaling roughly 81,029 sf) and renovations in the existing school buildings (totaling roughly 110,612 sf). Brevard High School will have a few existing structures demolished to allow new construction for a new two-story building to house an auxiliary gymnasium, kitchen/cafeteria, media center, administration offices and main entrance to the school. The 2nd new building addition, a single story, will provide new space for CTE coursework and provide a connection to the multiple existing classrooms. Interior renovations in the existing buildings on campus include electrical system upgrades, mechanical system upgrades, bathroom improvements, auditorium updates, full fire sprinkler in the space, upgrading/expanding the existing fire alarm system and various other finish scope updates. Sitework adjustments/improvements will be made to the existing site for access and parking while providing an expansive outdoor area leading to the football field. Bid Package Scope of Work Preliminary Budget - Preliminary Budget - Brevard Rosman BP220 Turnkey Site Development $ 2,107,694 $ 1,035,929 BP235 Demolition $ 1,104,845 $ 682,407 BP238 Turnkey Deep Foundations $ 198,066 $ 193,434 BP280 Site Fencing $ 27,700 $ - BP29 Landscaping Alternate Alternate BP390 Turnkey Concrete $ 1,353,435 $ 773,186 BP400 Turnkey Masonry $ 1,532,207 $ 1,030,292 BP500 Turnkey Structural Steel $ 2,533,571 $ 1,818,132 BP640 Finish Carpentry & Casework $ 131,525 $ 89,036 BP725 Sprayed on Fireproofing $ 11,893 $ - BP745 Metal Panels / Siding $ 439,130 $ 536,714 BP750 Roofing $ 475,798 $ 330,288 BP790 Caulking & Waterproofing $ 210,793 $ 199,658 BP800 Doors, Frames & Hardware $ 433,153 $ 397,292 BP840 Glass & Glazing $ 1,257,740 $ 755,155 BP850 Coiling Doors $ 215,433 $ 83,250 BP895 Translucent Wall Panels $ - Alternate BP92 Metal Studs, Drywall, Insulation $ 1,519,066 $ 1,180,866 BP925 ACT & Interior Ceilings $ 91,021 $ 265,412 BP930 Tile $ 289,630 $ 255,961 BP935 Terrazzo $ 108,886 $ - BP96 Resilient Flooring $ 304,251 $ 349,406 BP968 Wood Flooring $ 109,702 $ - BP990 Painting & Coatings $ 316,852 $ 264,063 BP1000 Division 10 Accessories $ 173,359 $ 200,827 BP1040 Signage $ - $ 50,875 BP1100 Auditorium Seating Alternate Alternate BP1240 Window Treatments Alternate Alternate BP1320 Walkway Covers / Canopies $ 213,675 $ - BP1330 Bleachers $ 63,363 $ - BP1340 Kitchen Equipment Installation $ 46,250 $ - BP1350 Fabric Banners $ 17,529 $ - BP1400 Conveying Systems $ 92,315 $ 100,825 BP1530 Fire Sprinkler Systems $ 728,521 $ 603,555 BP1540 Plumbing Systems $ 1,345,548 $ 780,942 BP1550 Mechanical Systems $ 3,701,268 $ 3,781,262 BP1600 Electrical Systems $ 4,104,630 $ 3,632,767

Details

,, 191,641 SF - 2 Middle/Senior High School, 81,029 SF Addition, 1 Middle/Senior High School, 110,612 SF Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents