Similar Projects
Olympus Master Plan
New Construction - 861,283 SF
Conception
$10,000,000 CJ est. value
Clermont, FL 34711

The Village at Town Center
New Construction, Renovation - 50,000 SF
Conception
Jacksonville, FL

International Swimming Hall of Fame Complex
New Construction - 20,000 SF
Design
$70,900,000 est. value
Fort Lauderdale, FL

Tiater Town
New Construction - 23,175 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Stuart, FL 34997

Alico Arena Hardening - Design Services
Renovation
Bidding
FL

Contract For The Installation Of Sports Netting On Fields 2 And 3 Of The Lantana Sports Park
Addition
Bidding
Lantana, FL 33462

South Walton Athletic Facility Baseball Complex Project
Post-Bid
FL

Continuing Contracts for Construction Manager at-Risk Services
Post-Bid
Plant City, FL

Lee County Player Development Complex and Youth Baseball Fields (CMAR)
Results
Fort Myers, FL 33916

Public Private Partnership Opportunity for Sports Venue
Results
FL

Kindred - Phase 2
New Construction - 1,906,608 SF
Construction
Kissimmee, FL 34744

Alfond Inn at Rollins College - Phase 2
New Construction
Construction
$24,623,940 est. value
Winter Park, FL 32789

Multipurpose Youth Sports Complex
New Construction
Pending Verification
$5,997,870 est. value
Green Cove Springs, FL

New Fran Carlton Center
New Construction
Pending Verification
$2,500,000 est. value
Apopka, FL

Pinecrest Academy Gymnasium
New Construction, Addition - 12,651 SF
Conception
Miami, FL 33185

Reported 02/11/2022 03:28 PM
Project Title

Launch Trampoline Park

Physical Address View project details and contacts
City, State (County) Orlando, FL 32828   (Orange County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method
Project Status Building in Operation as of first quarter 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Athletic Facility, 1 Story Above Grade, 44,900 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Plastering, Gypsum Board, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Athletic Flooring, Wall Coverings, Acoustic Treatment, Acoustic Finishes, Painting, Interior Painting.
Division 10 - Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Commercial Toilet Accessories, Emergency Aid Specialties, Lockers, Storage Assemblies, Other Specialties.
Division 11 - Equipment, Athletic and Recreational Equipment, Athletic Equipment.
Division 13 - Special Construction, Athletic and Recreational Special Construction.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents