Similar Projects
Temporary Traffic Control Services
Post-Bid
Greeley, CO

2020 Traffic Signal Maintenance Services
Results
Erie, CO 80516

CR 47 and Highway 392 Signalization Project (Materials Only)
Results
Greeley, CO 80632

37th Street and Two Rivers Parkway Traffic Signal
Post-Bid
Greeley, CO

Removal of Existing Traffic Signal Back Plates and Signal Head Visors
Results
Less than $1,000,000 est. value

Traffic Signal Directional Boring
Results
Less than $50,000 est. value
Greeley, CO

Removal of Existing Traffic Signal Backplates and Signal Head Visors, and Furnish and Install New Signal Head Backplatesand Visors Across Region 4
Results
$1,000,000 to $5,000,000 est. value

9th Avenue and 16th Street Traffic Signal Project
Results
Less than $252,000 est. value
Greeley, CO 80631

Signals replacement
Results
Less than $1,000,000 est. value

Signalization
Results
$1,000,000 to $5,000,000 est. value
CO

Promontory Traffic Conduit
Results
Greeley, CO 80631

4 CBD Traffic Signal Upgrade Projects
Results
Greeley, CO

2021 Traffic Signal Upgrade Projects
Infrastructure
Results
Greeley, CO 80634

Highway 34 and Promontory Parkway Traffic Signal and Turn Lane Project
Results
Greeley, CO 80631

Installing Signal Poles Region 4
Results
Less than $1,000,000 est. value
CO

Last Updated 07/02/2021 03:07 AM
Project Title

CR 47 and Hwy 392 Signalization Project

Physical Address View project details and contacts
City, State (County) CO   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project in general consists of the installation of a new traffic signal and advanced warning beacons at the intersection of Weld CR 47 and State Highway 392. The project includes but is not limited to the following work items: procurement of all traffic signal components except the signal poles and mast arms, drilling caissons for traffic signal poles, boring of electrical conduit and providing power to all four corners of the intersection, installation of the signal poles, mast arms and street lights, installation of advanced warning beacons, and all testing of the system.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents