Similar Projects
Reclaimed Water Line Rehabilitation from South Rim WWTP to School
Infrastructure
Bidding
$5,000,000 CJ est. value
Grand Canyon, AZ 86023

RFQ D/B - Flagstaff Ranger District (FRD) Main Office Electric Design and Repair
Infrastructure, Renovation
Bidding
$100,000 CJ est. value
Flagstaff, AZ 86004

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Post-Bid
$1,500,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Western MATOC
Results
$1,000,000 to $70,000,000 est. value

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

GAOA Cont 030406 - Cofknf Visitor Center Maintenance
Renovation, Build-Out, Term Contract - 23,819 SF
Post-Bid
$300,000 to $400,000 est. value
Flagstaff, AZ

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for New Construction, Renovation, and Repair of General Building Construction at Various Government Installations
New Construction, Renovation
Post-Bid

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

DEMA Camp Navajo Open-Air Transfer Facility
Addition
Results
Bellemont, AZ 86015

Last Updated 07/25/2022 03:36 AM
Project Title

Kaibab South Zone Fence Removal and Construction

Physical Address View project details and contacts
City, State (County) Williams, AZ 86046   (Coconino County)
Category(s) Government/Public, Heavy and Highway, Single Trades
Sub-Category(s) Fencing, Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SOUTH ZONE FENCE REMOVAL AND CONSTRUCTION - KAIBAB NATIONAL FOREST MAGNITUDE OF THIS PROJECT IS BETWEEN $100,000 AND $250,000 THIS ACQUISITION IS A TOTAL SMALL BUSINESS SET-ASIDE NAICS CODE: 238990 DAVIS-BACON WAGES APPLY - SEE ATTACHED WAGE DETERMINATION SUBMIT QUESTIONS BY JULY 27, 2022 TO: michael.carico@usda.gov DUE DATE FOR SUBMISSION OF QUOTES: AUG 03, 2022 AT 08:00 MST QUOTES SHOULD BE SUBMITTED ELECTRONICALLY TO: michael.carico@usda.gov VENDORS MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT (SAM) (WWW.SAM.GOV) TO BE ELIGIBLE FOR AWARD OF A FEDERAL CONTRACT (NOTE: REGISTRATION IS FREE ON THIS GOVERNMENT SITE) IF AWARDED A CONTRACT, VENDOR MUST BE ABLE TO START PROJECT IMMEDIATELY BONDS ARE REQUIRED IN ACCORDANCE WITH 12 BELOW Delivery: 100 Days After Notice to Proceed Delivery Location Code: 8156 KAIBAB NATIONAL FOREST 800 SOUTH 6TH STREET WILLIAMS AZ 86046 US 0001 Kaibab South Zone Fence Removal & Construction - SEE SCHEDULE Statement of Work/Specifications. (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J. 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract. D - SECTION D - Packaging and Marking E - SECTION E - Inspection and Acceptance 52.246-1 Contractor Inspection Requirements. (APR 1984) 52.246-12 Inspection of Construction. (AUG 1996) (a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components. (b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract. (C) Government inspections and tests are for the sole benefit of the Government and do not - (1) Relieve the Contractor of responsibility for providing adequate quality control measures; Solicitation No. 127EAX22Q0032 Page 7 of 42 Kaibab South Zone Fence Removal and Construction (2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance; (3) Constitute or imply acceptance; or (4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below. (d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization. (C) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract. (f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises. (g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed. (h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time. Annual Representations and Certifications. (MAR 2020) (a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238990. (2) The small business size standard is $16.5M. (3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees. (b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies. Period of Performance: The time period for the fence installation is: July 25- October 31, 2022 Forest closure may potentially occur due to fire conditions. Project Components: Heavy Fence Maintenance This would be a fence that is not old enough or in disrepair enough to replace but that has not been maintained for some time and will require cutting several trees off the fence, splicing several broken wires, replacing several stays and posts and possibly some braces, and tightening the fence up. When the bottom wire is in need of replacement, barbless wire shall be used. Fence Re-Construction This is a fence re-constructed to Forest Service specifications. Fence Roll-up and Removal Roll up and remove from FS lands all old fence material that can no longer be used. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents