Similar Projects
Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

Sunfield Phase 3 Section 6A Street, Drainage, Water, Wastewater, and Utility Improvements, The Sunfield Phase 3 Section 6B Street, Drainage, Water, Wastewater, and Utility Improvements; Sunfield Phase
Post-Bid
Buda, TX

Trails at Windy Hill Phase 2
Results
TX

Meadows at Buda, Wastewater Improvements
Results
Less than $181,760 est. value
Buda, TX 78610

Sunfield Phase 3 Section 5C Street Improvements and Sunfield Phase 3 Section 5C Drainage, Water, Wastewater, and Utility Improvements
Post-Bid
TX

Sunfield Phase 4 Section 3A Utilities Improvements
Results
Buda, TX 78610

Parten Ranch, Phase 5 Paving, Drainage, Water and Wastewater Improvements
Post-Bid
Dripping Springs, TX 78620

Trails at Windy Hill Phase Four and Five Paving, Drainage, Water and Wastewater Improvements
Results
TX

Plum Creek Marketplace Avenue Phase 2 - Water, Wastewater, Drainage, and Paving Facilities
Post-Bid
TX

Bunton Creek Interceptor Phase 2.0
Results
$3,000,000 to $4,000,000 est. value
Kyle, TX 78640

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Caliterra Phase 4 Section 11
Results
Dripping Springs, TX 78620

Driftwood Phase 1 Section 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

City of Kyle - Elliott Branch Wastewater Interceptor
Results
Less than $6,100,000 est. value
Kyle, TX 78640

Central Wimberley Wastewater Project
Post-Bid
Wimberley, TX

Last Updated 08/27/2020 12:36 PM
Project Title

Zorn Standpipe Rehabilitation Project

Physical Address View project details and contacts
City, State (County) San Marcos, TX 78666   (Hays County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $330,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is to clean, paint and repair the exterior and interior and complete top fill retrofit of the existing 385,000 gallon Zorn Standpipe including a new drain/overflow tee and overflow flap plate, manway, top fill retrofit and removal of interior ladder.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents