Similar Projects
Vehicle Barrier Maintenance & Repair Service (VB M&R) Draft RFP
Results

USTRANSCOM Pentagon Display
Results
Washington, DC 20301

Vehicle Barricades And Preventive Maintenance
Results
Washington, DC 20230

Z--Parapet Guard Railing Replacement
Post-Bid
$100,000 to $250,000 est. value
Washington, DC

Guiderails and Attenuators Repair and Replacement
Post-Bid
DC

Phase I Prequalification - Worldwide Design-Build Forced-Entry/Ballistic-Resistant/Anti-Ram Barrier Installation Projects (FE/BR II Program)
Post-Bid

Active Vehicle Barrier Program
Post-Bid

HSBC Retaining Wall
Renovation, Demolition - 13,311 SF
Results
Washington, DC 20007

Vehicle Barrier Maintenance and Repair Services
Post-Bid
Less than $1,000,000 est. value
Washington, DC 20223

R--Bollard Maintenance
Results
Washington, DC 20001

N--DC VAMC Campus Wide Retrofit Signage Package
Results
Washington, DC

Overhead Freeway Sign Maintenance
Post-Bid
Washington, DC 20003

Movable Barriers System
Bidding
Washington, DC 20009

Reported 09/25/2019 12:00 AM
Project Title

Vehicle Barrier Preventative Maintenance Services

Physical Address View project details and contacts
City, State (County) Washington, DC 20223   (District of Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The purpose of this procurement is to obtain maintenance service, inspections, and emergency repair services for six (6) vehicle barrier systems at two locations, to ensure that the barriers are in full operating condition 24 hours a day, 365 days a year. This contract shall cover preventive maintenance and other items not covered by the warranty for those units only until the warranty expires, at which time those units will be fully covered under this contract. The purpose of this contract is to minimize the barrier systems failures through a proactive preventive and corrective maintenance program.
Details
Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents