Similar Projects
Downtown Streets Improvement Project
Infrastructure
Bidding
Frenchtown, NJ 08825

Hilltop Drive and Moore Street Road Improvements
Post-Bid
Stockton, NJ 08559

2018-2019 NJDOT Municipal AID Funded Grant - George Street Improvements
Post-Bid
Lambertville, NJ 08530

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Route 78, Rockfall Mitigation
Results
$20,000,001 to $50,000,000 est. value
NJ

Runway 4-22 Rehabilitation Project
Term Contract
Construction
$1,800,000 est. value
Whitehouse Station, NJ 08889

Mill Road Improvement
Post-Bid
Lambertville, NJ 08530

Intersection Realignment of Anthony and Sliker Roads, Glen Gardner
Results
Glen Gardner, NJ 08826

Asphalt Paving
Post-Bid

Roadway Reclamation (FDR) of Manchester Road
Results
Flemington, NJ 08822

Lower Ferry Road Improvement
Post-Bid
Sergeantsville, NJ 08557

Resurfacing of Various County Roads and Parks In Various Townships
Results
Flemington, NJ 08822

2020 Road Program
Post-Bid
Hampton, NJ 08827

Roadway Resurfacing Milepost 83 to 122 Section 19 and 20
Results
$20,000,000 to $40,000,000 est. value

Bellis Road Phase III Roadway Improvement Project
Post-Bid
Milford, NJ 08848

Last Updated 12/21/2021 08:44 AM
Project Title

Phase I and II Warsaw Road Improvement Project

Physical Address View project details and contacts
City, State (County) Frenchtown, NJ 08825   (Hunterdon County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major components of the contract for Phase I are: 1,040 tons of 9.5M64 surface course, demolition of 186 linear feet of guide rail, 562 linear feet of new beam guide rail, and 4 tangent guide rail terminals. The major components of the contract for Phase II are: 911 tons of 9.5M64 surface course, 125 linear feet of guide rail, and 2 tangent guide rail terminals.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents