Similar Projects
Pavement Milling and Ultra-Thin Bonded Wearing Course
Bidding
Caribou, New Sweden, Woodland, ME

Asphalt Street Paving 2021
Bidding
Houlton, ME

Paving Project
Post-Bid
Mapleton, ME

Roads Grading/Street Sweeping/Heating
Post-Bid
Island Falls, ME

Hodgdon High School Paving Project
Results
Hodgden, ME 04730

Road Work on Sly Brook Road
Results
Eagle Lake, ME

Road Paving
Post-Bid
Saint Agatha, ME

Pavement Milling and Hot Mix Asphalt Overlay/Project is Located in Mars Hill on US Route 1 Beginning 0.01 Mile North of the US Route 1A Intersection and Extending North 1.57 Miles
Results
Less than $505,000 est. value
Mars Hill, ME 04758

Asphalt Street Paving 2020
Post-Bid
Houlton, ME

Crack Sealing
Results
ME

Paving of Three Streets
Post-Bid
Westfield, ME

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
ME

Airport Crack Sealing/Repair Project
Post-Bid
Less than $23,500 est. value
Presque Isle, ME

(LCP) Light Capital Paving
Results

2021-2022 Town Paving Projects
Term Contract
Post-Bid
Madawaska, ME

Last Updated 03/19/2020 07:07 AM
Project Title

Pavement Milling, Hot Mix Asphalt Overlay, and Ultra-Thin Bonded Wearing Course

Physical Address View project details and contacts
City, State (County) Blaine, Bridgewater, Caribou, Monticello, ME 04734   (Aroostook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement Milling, Hot Mix Asphalt Overlay, and Ultra-Thin Bonded Wearing Course/024455.00 is located on US Route 1 beginning in Monticello 0.15 mile south of the Bridgewater town line and extending north 0.80 miles/024459.00 is located on US Route 1 in Caribou beginning 0.06 miles north of the intersection of Route 161B and extending north 2.09 miles. Project also includes 1.03 miles of the southbound lane and two ramps off US Route 1. Description: Maine Federal Aid Project Nos. 2445500, WIN 24455.00 & 2445900, WIN 24459.00. Location: In Aroostook County: 1)Project 2445500 is on US Route 1 beginning in Monticello 0.15 mile south of the Bridgewater town line and extending north 0.80 miles. 2)Project 2445900 is on US Route 1 in Caribou beginning 0.06 miles north of the intersection of Route 161B and extending north 2.09 miles. Project also includes 1.03 miles of the southbound lane and two ramps off US Route 1.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents