Similar Projects
Pipeline Wet Tapping and Line Stop Continuing Construction Contract
Term Contract
Post-Bid
$5,500,000 est. value
West Palm Beach, FL 33416

Pipeline Cleaning Services
Term Contract
Post-Bid
West Palm Beach, FL 33415

State Road A1A Water Main Improvements - Phase 2
Results
$1,500,000 to $2,000,000 est. value
Gulf Stream, FL

Underground Contractor Services
Term Contract
Results
Highland Beach, FL 33487

Aerial (Pipe) Crossing, Maintenance Services
Term Contract
Post-Bid
Palm Beach, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Pre-Qualification of Vendors Ductile Iron-Pipe and Fittings
Term Contract
Post-Bid
West Palm Beach, FL

Nottingham Boulevard and Miller Avenue Utility Improvements
Results
Less than $3,500,000 est. value
West Palm Beach, FL 33402

Flushing Hydrants, Purchase and Delivery Of
Post-Bid
FL

Valve, Flow Control, Keystone, Purchase and Delivery
Results
FL

South County Reclaimed Water Transmission Pipeline Phase 1A
Results
Less than $10,300,000 est. value
West Palm Beach, FL

Emergency Utility Repairs for Water, Wastewater and Stormwater
Results
Lake Worth, FL 33460

Control Valves, AMES, Rebuild, Install and Start-Up Services
Results
FL

Cabana Colony 4-Inch Water Main Replacement
Results
Palm Beach Gardens, FL 33410

Construction Manager (CM) for Town Wide Overhead Utility Under Grounding Program - Phase Five, North and South
Results
West Palm Beach, FL 33401

Reported 08/17/2021 02:11 AM
Project Title

Juno Road Force Main Addition

Physical Address View project details and contacts
City, State (County) North Palm Beach, FL 33408   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of approximately 1,400 feet of 6-inch force main and approximately 1,200 feet of 3-inch low pressure force main

Details

Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents