Similar Projects
Last Updated | 09/09/2022 09:16 AM |
Project Title | Saint Lawrence Utility Improvements |
Physical Address | View project details and contacts |
City, State (County) | Saint Lawrence, SD 57373 (Hand County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,071,499 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of June 22, 2022, project was awarded to Dahme Construction Co, awarded amount is $3, 071, 499 ( $3, 071, 498. 56)** Each bid must be accompanied by a certified check or bank draft payable to the order of the City of St. Lawrence, South Dakota, in an amount equal to five percent (5%) of the total bid. A bid bond in an amount equal to ten percent (10%) of the total bid will be accepted in lieu of a certified check or bank draft. Surety for bid bond must be authorized to do business in the State of South Dakota Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138. The goal for Minority-Owned Business Enterprise (MBE) on this project is one percent (1%) and the goal for Woman-Owned Business Enterprise (WBE) on this project is four percent (4%). The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding and make awards to the Owner's best interest The major elements associated with the construction of the St. Lawrence Utility Improvements are approximately: Bid Schedule A: Water and Wastewater o 5,000 feet of 8-inch sanitary sewer main o 55 feet of 10-inch to 18-inch sanitary sewer main o 2,000 feet of CIPP liner (8-inch to 15-inch) o 25.2 vertical feet of manhole lining o 18 sanitary sewer manholes o 28 sewer main connections o 7,000 feet of post televising inspection o 70 sewer service connections o 1,800 feet of 4-inch sanitary sewer service pipe o 160 tons of rip rap o 100 cubic yards of dike excavation o 4,400 feet of 6-inch water main o 6 fire hydrants o 22 gate valves (4-inch to 8-inch) o 20 fittings of various sizes and types o 15 connections to existing water main o 65 water service connections o 1,500 feet of water service pipe o 7 15" water meter pits (furnished by Owner) o 167 square yards of concrete pavement, approaches or sidewalk o 31 feet of concrete curb and gutter o 7,250 square yards of milling asphalt/blotter and gravel base course o 5,600 cubic yards of street excavation o 7,200 square yards of geogrid o 600 feet of ditch grading o 600 feet of CMP culverts (12-inch to 24-inch) o 9,000 tons of gravel base course or surfacing o 1,230 tons of asphalt surfacing o 23,600 square yards of seeding o 33 culvert/inlet protection o 3,000 feet of pavement marking paint o Traffic control o All related appurtenances to the aforementioned work The major elements associated with the construction of the St. Lawrence Utility Improvements are approximately: Bid Schedule A: Water and Wastewater o 5,000 feet of 8-inch sanitary sewer main o 55 feet of 10-inch to 18-inch sanitary sewer main o 2,000 feet of CIPP liner (8-inch to 15-inch) o 25.2 vertical feet of manhole lining o 18 sanitary sewer manholes o 28 sewer main connections o 7,000 feet of post televising inspection o 70 sewer service connections o 1,800 feet of 4-inch sanitary sewer service pipe o 160 tons of rip rap o 100 cubic yards of dike excavation o 4,400 feet of 6-inch water main o 6 fire hydrants o 22 gate valves (4-inch to 8-inch) o 20 fittings of various sizes and types o 15 connections to existing water main o 65 water service connections o 1,500 feet of water service pipe o 7 15" water meter pits (furnished by Owner) o 167 square yards of concrete pavement, approaches or sidewalk o 31 feet of concrete curb and gutter o 7,250 square yards of milling asphalt/blotter and gravel base course o 5,600 cubic yards of street excavation o 7,200 square yards of geogrid o 600 feet of ditch grading o 600 feet of CMP culverts (12-inch to 24-inch) o 9,000 tons of gravel base course or surfacing o 1,230 tons of asphalt surfacing o 23,600 square yards of seeding o 33 culvert/inlet protection o 3,000 feet of pavement marking paint o Traffic control o All related appurtenances to the aforementioned work Bid Schedule C: Water Looping o 550 feet of 6-inch water main o 2 connections to existing water main o 1 water service connection o 4 fittings of various sizes and types o 470 tons of gravel surfacing o 950 square yards of seeding o All related appurtenances to the aforementioned work Bid Schedule D: Extra Asphalt Paving o 1,560 square yards of milling asphalt/blotter and gravel base course o 1,220 cubic yards of street excavation o 1,800 square yards of geogrid o 1,000 tons of gravel base course or surfacing o 230 tons of asphalt surfacing o All related appurtenances to the aforementioned work Bid Schedule E: Televising/Exploratory o 3,450 feet of cleaning, inspecting and televising sewer o 7 hours field locate existing sewer main o 21 hours expose existing sewer main for cleaning/televising o All related appurtenances to the aforementioned work Bid Schedule F: Sewer Main South of 2nd Street North o 3,460 feet of 8-inch sanitary sewer main o 110 feet of sewer main jacked in steel casing o 3,570 feet of post televising inspection o 9 sanitary sewer manholes o 4 sewer main connections o 20 sewer service connections o 740 feet of 4-inch sanitary sewer service pipe o 2,080 square yards of milling asphalt/blotter and gravel base course o 1,480 cubic yards of street excavation o 1,800 square yards of geogrid o 350 feet of ditch grading o 1,300 tons of gravel base course or surfacing o 330 tons of asphalt surfacing o 90 square yards of erosion control blanket o 3,000 square yards of seeding o All related appurtenances to the aforementioned work The Work will be substantially complete on or before November 1, 2023, Final completion- 30 days of the Date of Substantial Completion. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |