Similar Projects
Mechanical Joint Restraint Glands
Term Contract
Sub-Bidding
Chicago, IL 60604

Summer 2022 Life Safety Work - Bid Group 1
Alteration
Post-Bid
Oak Park, IL 60304

Chiller Pre-Purchase Thornridge High School
Alteration
Post-Bid
South Holland, IL 60473

Boiler Blowdown Header Replacement
Results
Winnetka, IL

Village Hall Chiller Replacement
Alteration
Results
Hoffman Estates, IL 60169

Boiler Replacement at Old Quarry MS
Alteration
Post-Bid
Lemont, IL 60439

Boiler Replacement at Multiple Schools
Alteration
Results
$35,000 to $45,000 est. value
Bartlett, Elgin, Streamwood, Wayne, IL 60120

Evanston Public Library Ventilation Fan Upgrade
Alteration
Post-Bid
Evanston, IL 60201

Morton College 2021 Mechanical Upgrades
Alteration
Results
Cicero, IL 60804

Signal Engineering Professional Services
Alteration
Post-Bid
Chicago, IL 60661

CPS Whistler ES MEP / Wacker Roof
Alteration
Results
Chicago, IL 60643

Helen M. Hefferan Elementary School Boiler Tube Replacement - Pre-Qualified Various Trades
Alteration
Post-Bid
$80,000 est. value
Chicago, IL 60624

CPS Avondale Logandale ES - Vaughn HS MEP
Alteration
Results
$9,000,000 est. value
Chicago, IL 60641

2022 Mechanical Equipment Pre-purchase at Conant High School
Term Contract
Post-Bid
Hoffman Estates, IL 60169

2022 Pool Mechanical Equipment Replacement
Alteration
Results
Oak Lawn, IL 60453

Last Updated 06/22/2023 02:38 AM
Project Title

Braintree Booster Station Generator Replacement Project

Physical Address View project details and contacts
City, State (County) Schaumburg, IL 60193   (Cook County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $774,625 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The northwest suburban municipal joint action water agency [NSMJAWA] will receive online electronic bids for the Braintree booster station generator replacement project. The work included in this contract shall consist of furnishing all the materials, labor, equipment and incidentals required to complete removal and replacement of generator including removal of existing diesel UST and connection of a new gas service at the Braintree booster station. And any appurtenant work required to make this a well-constructed project inclusive of all required safety measures and clean-up tasks to insure a successful project. The contractor will work in a deliberate and safe manner. The safety of the public, NSMJAWA staff, engineer, and the contractor's employees is the top priority. The projects will be constructed in a logical process by the contractor with approval from engineer and NSMJAWA . Site Directions: NSMJAWA Braintree Booster Station 880 Pinehurst Ln Schaumburg, IL 60193 The proposed work is officially known as NSMJAWA- BRAINTREE BOOSTER STATION GENERATOR REPLACEMENT PROJECT. Work includes the following: The CONTRACTOR is responsible to obtain the required municipal building permit from the Village of Schaumburg. Removal of 480V diesel standby generator, diesel fuel system, underground diesel fuel storage tank, impacted soils, excess materials, and associated mechanical and electrical connections. Installation of new 480V natural gas standby generator, utility supplied natural gas fuel system, and associated mechanical and electrical connections. Installation of new 480V Manual Transfer Switch (MTS), MTS Connection Cabinet, and associated electrical connections Provide temporary diesel standby generator during required construction activities included temporary cabling, cable protection, diesel fuel, and maintenance. Removal of intake louvers, modification to masonry openings, masonry wall repairs, and installation of new intake louvers. Civil site work including new fill materials, regrade of underground work areas, replacement of paving, curb, and sidewalks. Any additional appurtenant work required to make this a well-constructed project, and all required safety measures and clean-up tasks to insure a successful project. The Contractor will work in a deliberate and safe manner. The safety of the Public, and the NSMJAWA Staff and the Contractor's Employees is the TOP PRIORITY. NSMJAWA has determined that the work of this contract is subject to the Illinois Prevailing Wage Act. The Contractor will work in a neat fashion and ensure a clean workenvironment. The Contractor will properly clean and dispose of all work debris and neatly store all tools at the end of each workday. If questions arise regarding this Contract Document, please contact: Michael Monte, PE, ENV SP; Project Manager Greeley and Hansen LLC 100 S. Wacker Drive, Suite 1400 Chicago, IL 60606 312-558-9000 mmonte@greeley-hansen.com OR Ramesh Kanapareddy, PE; Executive Director NSMJAWA 901 Wellington Avenue Elk Grove Village, IL 60007 847-981-4083 rkanapereddy@nsmjawa.com The above-described work will be performed at the following location: Braintree Booster Station 880 Pinehurst Ln Schaumburg, IL 60193

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents