Similar Projects
1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Post-Bid
$300,000 est. value
Lansing, Tinley Park, IL 60438

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Post-Bid
$300,000 est. value
Lansing, Tinley Park, IL 60438

2022 Sidewalk and Concrete Maintenance
Results
Palatine, IL 60067

Street Resurfacing
Results
Park Ridge, IL

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

Lake Street Office
New Construction, Infrastructure - 67,600 SF
Construction
$16,600,000 CJ est. value
Chicago, IL 60607

Wabash Avenue Mixed-Use Development
New Construction, Infrastructure - 3,160 SF
Pending Verification
$68,000,000 CJ est. value
Chicago, IL 60605

Wabash Avenue Mixed-Use Development
New Construction, Infrastructure - 3,160 SF
Pending Verification
$68,000,000 CJ est. value
Chicago, IL 60605

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

153rd Street Resurfacing
Alteration
Post-Bid
Chicago, IL

Northwest Wheeling CNG Bus Maintenance & Storage Facility
New Construction
Results
$40,000,000 est. value
Wheeling, IL 60090

St. Alexius Medical Center Addition
Addition, Infrastructure, Renovation - 29,000 SF
Construction
$14,000,000 CJ est. value
Hoffman Estates, IL 60169

Focal Point Campus / Chicago
Demolition, New Construction, Infrastructure
Pending Verification
$700,000,000 CJ est. value
Chicago, IL 60623

Last Updated 05/23/2023 10:33 AM
Project Title

Spring South Road Reconstruction - Village of Schaumburg

Physical Address View project details and contacts
City, State (County) Schaumburg, IL 60193   (Cook County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2027
Bids Due View project details and contacts
Estimated Value $3,320,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

NWMC Contingency List (38.56 points) - This project consists of reconstructing Spring South Road from Wise Road to Irving Park Road. Spring South Road is a residential collector roadway with an existing traffic signal at the north and south limits of the project. Wise Road signal is under the jurisdiction of Cook County, Irving Park signal is under the jurisdiction of IDOT. This section will be approximately 0.4 miles in length. A bike path exists on the west side of the road. A condition assessment will be evaluated on the bike path. Additionally, the south half of the roadway is under the jurisdiction of Schaumburg Township. The village will look to enter into a joint partnership with the Township for these improvements. As of May 23 2023, this project is in the conceptual phase. An engineer has not been selected. It is included in the Village of Schaumburg's Fiscal Year 2024-2028 and funding for construction is allotted for FY 26/27. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents