Similar Projects
2021 Water System Improvements - Mingo Water Storage Tank Rehabilitation
Infrastructure
Post-Bid
Bixby, OK

Construct Fire Protection Water Storage Tank ?? EM to see if same as 2185108- Tanks sizes are different but project dates/site visits exactly SAME
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Enid, OK

Kingfisher Disinfection Byproduct Reduction
Infrastructure
Results
Kingfisher, OK

Plating Tank Repair
Post-Bid
Oklahoma City, OK

Repair Water Distribution System, Multi
Term Contract
Bidding
$10,000,000 est. value
Enid, OK 73705

Underground Storage Tank Removal - JHCC
Infrastructure
Results
$482,925 est. value
Lexington, OK 73051

Water Tower Repair
Renovation
Post-Bid
El Reno, OK 73036

Reported 09/22/2021 12:00 AM
Project Title

Construct Fire Protection Water Tank & System, Multi

Physical Address View project details and contacts
City, State (County) Enid, OK 73701   (Garfield County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and consists of the following: Demolish existing 250,000 gallon water storage tank, berm, existing mpiping and electrical connections. Construct a new 250,000 gallon water storage tank in the same location as the original tank. Connect all required pipes and electrical connections to provide a working functional water storage tank. Demolish and replace existing fire pumps in building190. Demolish and replace all piping into and out of the building. Install a new sprinkler system in the building.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents