Similar Projects
I-215; Various Locations Preservation - Roadway
Bidding
$500,000 to $1,500,000 est. value
UT

300 East (11400 South to 11800 South) Reconstruction Project
Bidding
Draper, UT 84020

500 South Main Street Development
Post-Bid
Salt Lake City, UT

Southern Utah Rotomill RFI
Post-Bid
Salt Lake City, UT 84104

Porter Rockwell Blvd. (5th Segment) New Construction
Results
$3,000,000 to $4,000,000 est. value
UT

DFCM Construction-Pre Qualification for General/Mechanical/Electrical/Roofing/Paving Contractors
Results
$3,500,000 est. value

McDonald`S #43-0069
Construction
Sandy, UT 84070

2020 High Density Mineral Bond
Bidding
South Jordan, UT 84095

Concrete Pavement Cold Patch Repair
Term Contract
Post-Bid

8800 South Reconstruction Project - Phase 1
Results
Sandy, UT

2020 Shoulder Improvements
Bidding
Sandy, UT 84070

Reconstruction for Foxbridge Streets
Post-Bid
Midvale, UT

9-Line Corridor Improvements
Results
$720,000 est. value
Salt Lake City, UT

200 W-Main St, Main St; S Temple-500 S. Transportation Alternatives
Post-Bid
Less than $500,000 est. value
UT

DFCM Construction - DOC USCF Off-Site Infrastructure Improvements
Results
Less than $70,000,000 est. value
Salt Lake City, UT

Last Updated 05/09/2019 07:47 AM
Project Title

4100 South Bangerter Highway to 5460 West

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project consists of approximately two miles of roadway reconstruction in a residential and commercial urban environment. The scope includes some rotomilling and asphalt overlay work, and reconstruction of pavement, curb gutter and sidewalk throughout much of the corridor. The project will add a westbound through lane at 4000 West, reconstruct traffic signals, construct a large drainage trunk line, and replace GHID water lines in. Street lights and trees will be built in the parkstrip, along with various segments of wall construction behind the sidewalk.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents