Similar Projects
M1lb--Asphalt Repair Services
Post-Bid
Milwaukee, WI 53295

Runway 7R-25L Pavement Rehabilitation Material Testing
Renovation
Post-Bid
Milwaukee, WI 53207

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Lake Parkway - Milwaukee / St. Francis, E. Lincoln Avenue to S. Pennsylvania Avenue
Results
Milwaukee, Saint Francis, WI 53207

East-West BRT Intersection
Post-Bid
Milwaukee, WI

Brown Deer Road, C Milwaukee and V Brown Deer, 91St Street to Deerbrook Trail
Results
Brown Deer, Milwaukee, WI

Milwaukee Mitchell International Airport T & M Metal Fabrication & Asphalt Paving
Term Contract
Post-Bid
Milwaukee, WI

2021 Concrete Pavement Patch
Results
Less than $700,000 est. value
Cudahy, WI

2021 Time And Material Zoological Gardens
Term Contract
Post-Bid
Milwaukee, WI

Carrington Avenue and Kirkwood Avenue Water Main Replacement and Asphalt Pavement Rehabilitation
Results
$300,000 est. value
South Milwaukee, WI

Asphalt High Impact Paving- Group 3
Post-Bid
Milwaukee, WI

2021 Resurfacing
Renovation
Results
Glendale, Milwaukee, WI

Remodeling and Repairs 2820 N 22Nd Street
Renovation
Post-Bid
Milwaukee, WI

2021 Green Infrastructure Upgrades Bid Package 2
Results
Milwaukee, WI 53204

Asphalt High Impact Paving- Group 4
Post-Bid
Milwaukee, WI

Reported 06/30/2022 03:22 PM
Project Title

North Avenue Paving - Mayfair Road to 117th Street - 1112 - City of Wauwatosa

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53226   (Milwaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As part of the DOT North Leg construction, the freeway will be lowered several feet where it crosses North Ave. This freeway lowering will then cause North Ave and its utilities to also be lowered. This project is currently underway and is anticipated to be complete by late 2023. Most of the North Avenue pavement will be completely reconstructed in 2022. Included in this project are reconstructed left turn lanes from North Ave onto 116th Street. As of June 29, 2022, this project is included in the City of Wauwatosa's FY 2022-2026 CIP. Information on design firm has not been disclosed. A firm timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents