Similar Projects
SH 87 - Ferry Operation Projects
Alteration
Bidding
$6,783,196 est. value
Port Bolivar, TX 77650

Construction of Water, Sanitary Sewer, Drainage and Paving to Serve Westwood Section 10
Infrastructure
Bidding
$530,000 est. value
Texas City, TX

Construction of Concrete Sidewalk and Ramp
Post-Bid
Dickinson, TX

Construction of Water, Sanitary Sewer, Drainage and Paving to Serve Westwood Section 9
Post-Bid
League City, TX

Galveston County Road and Bridge Facility Rebuild
Results
Dickinson, TX 77539

Construct Curb Ramps and Signal Improvements
Results
Less than $2,950,761 est. value
TX

Texas City Park & Ride - Administration Facility
New Construction - 13,100 SF
Construction
Texas City, TX 77591

Pier 10 Redevelopment Roadways, Drainage, Illumination and Traffic Signals
Infrastructure
Post-Bid
Galveston, TX

Annual Asphalt Maintenance
Results
Less than $94,297 est. value
Galveston, TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Stewart Beach Parking Lot Grading Project
Results
Galveston, TX 77550

East End Cruise Corridor Development 20th Street to Royal Caribbean Way
Infrastructure
Post-Bid
Galveston, TX 77550

Construction of Paving Facilities in Hughes Road Extension No. 1
Results
Less than $550,000 est. value
Dickinson, TX 77539

Cruise Terminal 1 Walkway Circulation Improvements
Infrastructure
Post-Bid
Galveston, TX

Restoration of Roadway
Results
$4,468,957 est. value
TX

Reported 05/27/2022 12:00 AM
Project Title

FM-518 Illumination Installation

Physical Address View project details and contacts
City, State (County) Friendswood, TX   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The main elements of this project consist primarily with the installation of three types of fully operational light poles (an 18' pedestrian pole, a 32' roadway/pedestrian pole, and a 32' roadway pole) along FM 518 between FM 2351 and Whispering Pines Avenue in Friendswood, Texas. Care shall be taken in the installation of the preceding repairs made to any damaged assets. The Contractor shall return any disturbed hardscape (including sidewalks, pavers or concrete) or softscape to pre-construction conditions.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents