Similar Projects
Mountain View Apartments - Park Lot Improvements - Phase II
Renovation
Post-Bid
Slatington, PA 18080

2021 FB Modified Pavement Overlay, Seal Coat and Fog Seal
Infrastructure
Post-Bid
Allentown, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Asphalt Paving Repairs at Howard A Eyer Middle School
Results
Macungie, PA 18062

2021 Roadway Crack Seal, Chip Seal, Mastic and Fog Seal
Infrastructure
Post-Bid
Allentown, PA

Township Line Road Full Depth Reclamation and Paving Project
Results
$500,000 est. value
Bethlehem, PA 18020

Wiley Street Reconstruction Project
Results
Fountain Hill, PA 18015

Stanley Avenue and Hoffert Street Reconstruction Project
Results
Fountain Hill, PA 18015

2020-10 Carlton Avenue Reconstruction
Results
Bethlehem, PA

US 22 Resurface 15th Street to I-78 Split
Results
$15,000,000 to $19,999,999 est. value
PA

2020 Street Maintenance Project
Results
Center Valley, PA 18034

ABE Parking Booth and Roadway Improvements
Results
$1,000,000 est. value
Allentown, PA 18109

222, Shantz and 863 Improvement
Results
$12,500,000 to $14,999,999 est. value
PA

2020-19 Bethlehem Golf Course Cart Paths
Results
Bethlehem, PA 18017

2020 Road Program - Troxell Street Neighborhood Improvements
Results
Allentown, PA 18109

Last Updated 10/01/2021 11:35 AM
Project Title

2021 Street Maintenance Project

Physical Address View project details and contacts
City, State (County) Center Valley, PA   (Lehigh County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $245,042
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include, but will not necessarily be limited to, providing all equipment, materials, labor, supervision, and testing services. Double bituminous seal coat and micro surfacing. The Contractor shall cover all manhole covers, valve boxes, inlets, and any other utilities on all roadways. Covers shall be removed by the Contractor after roadway treatments have properly cured.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents