Similar Projects
Roads NFSR 100 Surfacing and Stabilization
Infrastructure
Bidding
$250,000 to $500,000 est. value
Gray Mountain, AZ

N6269 Cowsprings Double Chip Seal
Infrastructure
Bidding
Tonalea, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Post-Bid
Kaibito, AZ

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $1,900,000 est. value
Cameron, AZ

JOC - Street Maintenance Projects
Results
Sedona, AZ

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Shelby Drive Roadway Improvements Project
Results
$1,644,300 est. value
Sedona, AZ 86336

Forest Road Connection Project
Infrastructure
Post-Bid
Sedona, AZ 86351

System Preservation (Restoration/Rehab/Resurface)
Results
$21,000,000 est. value
Flagstaff, AZ 86004

N1012 3.50 Mile to Nanees Dizi, Road Improvement
Infrastructure
Post-Bid
Tuba City, AZ 86045

Guardrail Improvements and Shoulder Widening
Results
$5,400,000 est. value
Pine, AZ 85544

Los Abrigados to Brewer Road Connection Project
Infrastructure
Post-Bid
$150,000 est. value
Sedona, AZ 86336

Coconino Estates Phase II Improvements
Results
Flagstaff, AZ

Last Updated 05/25/2022 03:58 AM
Project Title

Fredonia Highway (US 89A) (Sr 67 Jct to Nf-248d)

Physical Address View project details and contacts
City, State (County) North Rim, AZ   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of removing and replacing 2 of existing asphalt concrete full width, followed by a chip seal coat (full width). The work also includes pavement marking, traffic control and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents