Similar Projects
Gulf Intracoastal Waterway Fy19 Corpus Christi to Port Isabel and the Channel to Harlington
Design
$5,000,000 to $10,000,000 est. value
Corpus Christi, TX

FY20 GIWW Rollover to Causeway Maintenance Dredging - Pipeline Dredging
Design
$5,000,000 to $10,000,000 est. value

Annual Dredging Services
Term Contract
Post-Bid
Corpus Christi, TX 78403

Freeport Harbor, Texas, Channel Improvement Project, Reach 3 Lower Stauffer Channel in Brazoria County, Texas, Pipeline Dredging.
Post-Bid
$10,000,000 to $25,000,000 est. value
TX

Mouth of Colorado Maintenance Dredging
Results
$5,000,000 to $10,000,000 est. value
TX

Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Rapid Response Pipeline Dredging
Results
$45,000,000 est. value

Fy21 Houston Ship Channel Exxon to Carpenters - Dredging
Design
$5,000,000 to $10,000,000 est. value
Houston, TX

Single Award Task Order Contract (SATOC) for Mechanical Dredging for the US Army Corps of Engineers, Galveston District and the Southwestern Division.
Post-Bid
$5,000,000 to $10,000,000 est. value
Galveston, TX

USACE Galveston District, FY20 Sabine Neches Waterway (SNWW) Hopper Maintenance Dredging, Jefferson County, Texas
Results
$10,000,000 est. value
TX

FY21 USACE Galveston District, Sabine-Neches Waterway (SNWW) Maintenance Dredging, Jefferson County, Texas Pipeline Dredging, Deep Draft
Design
$5,000,000 to $10,000,000 est. value
Galveston, TX

Corpus Christi Ship Channel PA 13
Post-Bid
$5,000,000 to $10,000,000 est. value
Corpus Christi, TX

FY20 Matagorda Ship Channel, Matagorda Peninsula to Point Comfort Texas, Pipeline Maintenance Dredging, Matagorda and Calhoun Counties, Texas.
Results
$5,000,000 to $10,000,000 est. value
Matagorda, TX

Gulf Intracoastal Waterway, Texas Corpus Christi To Port Isabel, Pipeline Dredging
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Corp Christi, TX

Cedar Bayou, TX Construction
Post-Bid
$45,000,000 to $55,000,000 est. value
Houston, TX

Lake Tawakoni Recreation Facility Phase 1 Dredging
Results
Point, TX 75472

Last Updated 10/05/2021 11:04 AM
Project Title

Brazos Island Harbor, Texas, Jetty and Entrance Channel in Cameron County, Texas, Maintenance Hopper Dredging

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX 78401   (Nueces County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Information: The work consists of Schedule No. 1 - Maintenance dredging of Brazos Island Harbor, Jetty and entrance channels. Estimated quantity is 450,000 cubic yards (CY). Dredged material will be placed at placement area Nearshore Berm BU site 2A/2B. Contractor is to commence work within 10 calendar days after the date the Contractor receives the Notice to Proceed (NTP). Complete the entire work ready for use not later than 26 calendar days after the date the Contractor receives the NTP. Options 1-4 are for Sea Turtle Trawling and Relocation. Option 5: Placement of dredged material at Beach Placement area DMPA No.1 and No. 5 in lieu of Nearshore Berm BU site 2A/2B. If awarded, an additional 14 calendar days will be added to the contract duration.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents