Similar Projects
Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

Asphalt Pavement Repairs
Infrastructure
Bidding
Port Orchard, WA

2022 Citywide Asphalt Repair Project Contract
Infrastructure
Bidding
$46,000 to $815,000 est. value
Port Orchard, WA

2022 Preservation Project - Glenwood Rd & Holly Road
Infrastructure
Post-Bid
$900,000 to $1,250,000 est. value
WA

Sportsman Club and New Brooklyn Road Intersection Improvements
Infrastructure
Post-Bid
$920,000 est. value
Bainbridge Island, WA 98110

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Systemic Safety Improvements
Infrastructure
Bidding
$180,000 to $210,000 est. value
Poulsbo, WA

2022 Western Region Pavement Preservation MATOC
Alteration
Post-Bid
$300,000 to $10,000,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

2022 Annual Roads Program
Infrastructure
Bidding
$575,000 to $650,000 est. value
Bainbridge Island, WA

Central Valley Road Non Motorized Improvements
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
WA

Preservation Glenwood Road and Holly Road
Infrastructure
Results
$900,000 to $1,250,000 est. value
WA

Burley Glenwood Elementary School - ADA Site Improvements
Infrastructure
Bidding
$500,000 to $600,000 est. value
Port Orchard, WA 98367

Last Updated 04/21/2022 05:26 AM
Project Title

Lippert Road Repair and Sidewalk Retrofit Project

Physical Address View project details and contacts
City, State (County) Port Orchard, WA 98366   (Kitsap County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $590,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of work to be performed within 65 working days from notice to proceed, and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental theretofore and as generally described as follows: Schedule A: Roadway Resurfacing and Repairs, Lippert Avenue, Pottery Avenue to Sidney Avenue Schedule. B: Sidewalk and Associated Stormwater Drainage Improvements, Lippert Avenue, Pottery Avenue to Sidney Avenue.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents