Similar Projects
Last Updated | 04/02/2021 06:16 AM |
Project Title | DFCM Construction - Bear Lake Rest Area Phase II Improvements |
Physical Address | View project details and contacts |
City, State (County) | Laketown, UT (Rich County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $650,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Bear Lake Rest Area Phase II Improvement Project consists of the following work: construction of approximately 35,125 square feet of asphalt pavement. Included with the asphalt work is placement of aggregate base course, roadway excavation, and grading. Also included is the construction of approximately 6,450 square feet of concrete flatwork/sidewalk, along with concrete waterways and curb and gutter, and the installation of a canopy structure that was disassembled during a previous project phase. Installation of storm drain system improvements, irrigation system updates, and landscaping. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |