Similar Projects
Manatee Protection Systems Maintenance & Repair
Results
Alva, Canal Point, Cape Canaveral, Moore Haven, Port Saint Lucie, Stuart, FL

Manatee Protection Systems Maintenance & Repair
Results
Alva, Canal Point, Cape Canaveral, Moore Haven, Port Saint Lucie, Stuart, FL

Manatee Protection Systems Maintenance & Repair
Results
Alva, Canal Point, Cape Canaveral, Moore Haven, Port Saint Lucie, Stuart, FL

Manatee Protection Systems Maintenance & Repair
Results
Alva, Canal Point, Cape Canaveral, Moore Haven, Port Saint Lucie, Stuart, FL

Manatee Protection Systems Maintenance & Repair
Results
Alva, Canal Point, Cape Canaveral, Moore Haven, Port Saint Lucie, Stuart, FL

Manatee Protection Systems Maintenance & Repair
Results
Alva, Canal Point, Cape Canaveral, Moore Haven, Port Saint Lucie, Stuart, FL

Hebert Hoover Dike, Structures S-269 and S-270 Ramp Paving and Electrical Service, Palm Beach County, Florida
Post-Bid
$250,000 to $500,000 est. value
Palm Beach, FL 33480

Lake Apopka Duda Water Storage Improvements
Results
Less than $2,389,000 est. value

Lake Apopka Duda Water Storage Improvements
Results
Less than $2,389,000 est. value

Salinity Barrier Improvements
Results
Jupiter, FL

Tsala Apopka Golf Course Control Structure Modification
Results
$500,000 est. value
Inverness, FL 34450

Structures - S-160 and S-163 Gate Refurbishment Support
Results
$500,000 to $999,000 est. value
Tampa, FL 33610

Lake Pretty Structure Replacement
Results
Less than $200,000 est. value
Odessa, FL 33556

Hillsborough River Dam North Embankment Remediation
Post-Bid
$517,080 est. value
FL

Last Updated 03/10/2020 02:17 PM
Project Title

Dogwood Lakes Dam Improvements

Physical Address View project details and contacts
City, State (County) FL   (Holmes County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $246,492
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes demolition and removal of the existing outfall and replacement with a Type H box and 160 feet of 48" RCP. The project also includes the construction of a new concrete headwall , Alabama Class III riprap and installation of a new clay core for the dam. Additional work includes installation of new base, pavement and sodding.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents