Similar Projects
The Dansby Tower
New Construction - 1,250,000 SF
Conception
$250,000,000 est. value
Birmingham, AL

1211 27th Place South
Renovation
Conception
Birmingham, AL

Kimberly Senior Center
Renovation
Design
Kimberly, AL 35091

Village at Hays Reserve Apartment Complex
New Construction
Design
$60,000,000 est. value
Huntsville, AL 35810

Sandra Moon Community Center Phase 2
New Construction, Renovation - 110,000 SF
Bidding
Huntsville, AL 35802

Owner's Representative / Program Manager for the Saban Center project
New Construction
Bidding
Tuscaloosa, AL 35401

The Gabriel
New Construction - 110,023 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Madison, AL 35757

The Gabriel
New Construction - 110,023 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Madison, AL 35757

Quadplex Apartment Complex Project Phase II
New Construction, Renovation
Post-Bid
McIntosh, AL

Key Springs Apartments Interior Renovation Phase 2
Post-Bid
Hamilton, AL 35570

Interior Renovations To Jordan-Neill Apartments
Renovation
Results
Less than $978,942 est. value
Decatur, AL 35601

Repairs to Casualty Apartments
Results
Decatur, AL 35601

Vesta
New Construction - 390,000 SF
Construction
$53,000,000 est. value
Birmingham, AL 35205

Eastwood f/k/a Gardendale
New Construction - 464,308 SF
Construction
$30,000,000 est. value
Gardendale, AL 35071

620 East Glenn Condos
New Construction
Pending Verification
Auburn, AL 36830

Last Updated 01/20/2022 03:43 PM
Project Title

Anthem Apartments and Cottages f/k/a Plummer Road

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35811   (Limestone County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club
Contracting Method
Project Status Construction Commenced June 2020, Construction Completion Expected May 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

14 Apartments/Condominiums, 2 to 3 Stories Above Grade, New Construction, 1 Clubhouse/Social Club, 1 Story Above Grade, 3,740 SF New Construction, 774 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools.
Division 14 - Conveying Equipment, Elevators.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents