Similar Projects
Chase Building Cabinet Unit Heater Replacement
Renovation
Sub-Bidding
$70,000 CJ est. value
Greeley, CO 80631

Computer Room Air Conditioning (CRAC) Unit Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Greeley, CO 80631

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replace Chiller, McKee Hall
Results
Greeley, CO 80639

Heat Exchanger Tube Bundles
Results

USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Post-Bid

Chiller Replacement - Winograd K-8
Results
Less than $100,000 est. value
Greeley, CO 80634

Rocky Ford HS HVAC Emergency Grant Project
Infrastructure
Post-Bid
Dacono, CO 81067

CU Denver PN20-112394 - SCPP Only
Alteration
Results
$125,000 est. value
Denver, CO 80204

Replace HVAC System #49 Replace Water Soft #118
Alteration
Post-Bid

LSC Replace HVAC Heating Zone Valves
Alteration
Results
$125,000 est. value

Replace HVAC Systems, Platte Valley, and Marvin Foote Youth Services Centers Phase 1 of 2
Term Contract
Post-Bid
$200,000 CJ est. value
Greeley, CO 80631

Cooling Tower Replacement - Centennial Center
Alteration
Results
Less than $1,000,000 est. value
Greeley, CO 80631

Household Hazardous Waste Building HVAC and Alarm Upgrades
Renovation
Post-Bid
Greeley, CO 80631

Last Updated 08/22/2022 08:03 PM
Project Title

Mead WWTF Headworks Mechanical Bar Screen Replacement and Ventilation Improvements

Physical Address View project details and contacts
City, State (County) Platteville, CO 80651   (Weld County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $285,700 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include all necessary labor, supervision, equipment, tools, and materials to demolish the existing mechanical bar screen and ventilation system and replace with a new bar screen and ventilation system. Installation of all electrical wiring, control panels, and associated site work will be part of this project. General Requirements - Bid Deposit Required - Insurance Required - Contractors License Required - Installation Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % Job Location Mead, Colorado Question Acceptance Deadline 08/15/2022 07:00 PM EDT Questions are submitted online No

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents