Similar Projects
Bluffs of South Haven Condominium Association - Shoreline Protection Project
Renovation - 490 SF
Design
South Haven, MI 49090

2021 Site Improvements Program
Infrastructure
Bidding
Novi, MI

Marshall Iron and Metal - In-Situ Remediation
Alteration
Bidding
Marshall, MI 49068

Bavarian Inn Lodge - Flood Plain
Renovation
Post-Bid
Frankenmuth, MI 48734

Demolition 3 Story Building
Demolition
Post-Bid
Muskegon, MI

Demolition of a House at 403 Lytle Street
Demolition
Results
Harbor Beach, MI

AGY Chippewa County M-123 ORV Grading
Results
MI

Covenant Health Center
New Construction - 24,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Detroit, MI 48228

PNC Bank Branch No. B605
Renovation
Construction
Kentwood, MI 49508

Mi Favorita Grocery Store - Parking Lot Expansion
New Construction, Demolition
Pending Verification
Holland, MI 49423

302 South James Street-Universal Waste Disposal, Asbestos Abatement and Demolition
Demolition, Alteration
Bidding
Ludington, MI 49431

80th Avenue from M-40 to 29th Street, Porter Township; Clearing, Restoration and Final Grading
Post-Bid
Lawrence, MI 49064

CDBG Demolition of Structures
Demolition
Results
Less than $19,979 est. value
Lincoln Park, MI

PNC Bank Branch No. B703 Cascade
Renovation
Construction
Grand Rapids, MI 49546

Gratiot Metal Site - Site Services
Infrastructure
Bidding
Ithaca, MI 48847

Last Updated 07/01/2021 12:31 PM
Project Title

Armen Cleaners - Demo and Remedial Excavation

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48103   (Washtenaw County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of demolition, transportation and disposal of the existing dry cleaner building. Building debris that can be recycled shall be recycled to the extent practical. The Work also consists of excavation, transportation and recycling and/or disposal of concrete and asphalt. The Work also consists of excavation, transportation, and disposal of CVOC impacted soil; the primary constituents of concern are perchloroethylene (PCE) and trichloroethylene (TCE). The Work also consists of the proper removal and disposal of a 1,000-gallon heating oil underground storage tank (UST). Engineered support-of-excavation system shall be utilized at the excavation perimeter. Supplemental information provided within the Contract Documents (Appendices) include soil investigation results, soil boring logs, and groundwater analytical results. CONTRACTOR shall obtain all necessary permits and approvals to complete the work.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents