Similar Projects
Repair of Storm Water Drainage Systems
Post-Bid
Snellville, GA 30078

Water Drainage at Carl City Park
Post-Bid
Carl, GA 30203

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

Sweetwater Creek Rehabilitation - Phase 1
Results
Less than $2,022,280 est. value
East Point, GA

First Street Resurfacing, Street, Water Extension
Post-Bid
Richmond Hill, GA 31324

Claradon Avenue and Benning Drive Culvert Work
Results
Columbus, GA

Design Build Repair or Replace Culverts Roadway Reconstruction
Post-Bid
Greenville, GA 30222

Revetment Rehabilitation
Results
Brunswick, GA

Concrete Pipe Annual Contract
Term Contract
Post-Bid
Gainesville, GA 30501

Smith Street Drainage Improvements
Results
Hagan, GA 30429

Landslide Stabilization on the Forests
Post-Bid
Chatsworth, GA

Site 2 MSWL - Phase 1 and 2 Closure Construction at the Newton County Lower River Road Landfill
Results
Less than $2,675,936 est. value
Covington, GA 30014

Shovel Ready 2019 Community Development Block Grant
Post-Bid
Ocilla, GA

LMIG Paving and Drainage Improvements
Results
Moultrie, GA 31776

Construction of the Lamb Loop Street and Drainage Improvements to Serve the CCBCI Distribution Center
Post-Bid
Less than $725,000 est. value
Tifton, GA 31793

Last Updated 08/17/2021 03:25 PM
Project Title

Shadrack Street Drainage Improvements

Physical Address View project details and contacts
City, State (County) Waynesboro, GA 30830   (Burke County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Storm system rehabilitation including, but not limited to, removal and replacement of storm mains with approximately 196 LF of 24” HDPE, 862 LF of 42” HDPE, and 1571 LF of 54” HDPE storm mains using the slip lining method. The project will also consist of new manholes, pavement replacement, 4,471 SY of milling, and 961 tons of pavement overlay.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents