Similar Projects
Reported | 02/05/2021 12:00 AM |
Project Title | Drainage Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Princeton, NC 27569 (Johnston County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes the following Work: Division 1: The “Center Street and Elm Street Drainage Improvements” projects will replace existing culverts along Elm Street, Edwards Street, Pine Street, and the replacement of a culvert below the existing railroad. Work involves demolition of existing storm conveyance structures and piping, and the installation of new facilities. Jack and boring of storm piping will be required below existing railroad. Backfill of utility piping and placement of road subbase, hot asphalt pavement, concrete curbing and sidewalk as it pertains to trenching operations. All related erosion control, traffic control, and associated work is also included. Division 2: The “Beaver Dam Creek Bank Stabilization and Culvert Replacement” project will replace the culverts beneath North Pearl Street with aluminum 12’7” x 5’2” box culverts and associated appurtenances. The Beaver Dam Canal will be regraded, between North Center Street and North Pearl Street, and lined with geotextile and Class 1 or Class B riprap, as identified. All related erosion control, traffic control, water control, and associated work is included. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |