Similar Projects
Annual Requirements Contract - Ceiling Tiles and Support Components
Term Contract, Alteration
Bidding
Yaphank, NY

Center Moriches Library - Interior Alterations and New Gas Service
Alteration
Bidding
Center Moriches, NY 11934

Window Treatment
Alteration
Post-Bid
Ronkonkoma, NY 11779

Y1DA--Flooring Project
Term Contract
Post-Bid
Northport, NY 11768

Continuation of Rainbow Room "Floors"
Alteration
Results
Lindenhurst, NY

Interior Alteration of the Existing OTP Clinic
Alteration
Results
Hauppauge, NY 11788

Gymnasium Floor Resurfacing
Alteration
Bidding
$400,000 est. value
Stony Brook, NY 11794

Carpet, Flooring and Cove Base
Term Contract, Alteration
Post-Bid
Great River, NY 11739

Davis Homestead Plaster Repair
Alteration
Results
Middle Island, NY 11953

Partition Repairs
Alteration
Bidding

Wall Covering
Alteration
Post-Bid
Oakdale, NY 11769

Roosevelt Community Facade and Stair Tower Repairs
Alteration
Results
Stony Brook, NY 11790

Recaulk North, East & West Sides
Term Contract
Post-Bid
Farmingdale, NY 11735

Flooring Supply and Installation
Term Contract
Results
NY

Annual Requirements Contract - Carpet and Carpet Installation
Term Contract
Post-Bid
Yaphank, NY

Reported 04/09/2022 12:00 AM
Project Title

772 Hawkins Avenue Cmm Remove and Replace Sheetrock, Insulation and Flooring (Garage and Bedroom)

Physical Address View project details and contacts
City, State (County) Lake Ronkonkoma, NY 11779   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior, Flooring
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work includes, but is not necessarily limited to the following: 1. Work area is one bedroom on second floor and garage. 2. Bedroom walls ( 300 Sqft) and flooring (approx. 120 Sqft) are. Any weak or damaged structural members are to be repairs or replaced. Any mold/mildew issues are to be addressed. All electrical devices are to remain. 3. Install new ( 120 sqft) % tongue and grove plywood subflooring according to manufacturer's instructions. 4. Install ( 300sqft) 5/8" fireproofsheetrock on walls in bedroom. Install new trim to doors and windows where needed. Tape, prime and paint new work to industry standards. 5. Garage to have all sheetrock removed to be removed down to studs and rafters (walls 270sqft and ceiling approx. 230sqft). Any mold/mildew issues are to be addressed. Any weak or damaged structural members are to be repairs or replaced. All electrical devices are to remain. 6. Add new insulation in garage ceiling ( 230sqft) to code. 7. Install ( SOOsqft) ofnew 5/8 fireproofsheetrock in garage. Install new trim to doors and windows where needed. Tape, prime and paint new work to industry standards. 8. Re-install all outlets. Light fixtures, Switch plates, F/A devices, ect.. that were disturbed during construction. 9. All work to currant NYS codes and OPWDD regulations. 10. All debris to be removed offsite

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents