Similar Projects
SFB Flooring Renovation
Bidding
Palo Verde, AZ 85343

Carpet Removal & Installation and Tile Abatement
Bidding
Phoenix, AZ

Middle School Asbestos Tile Removal Project
Post-Bid
Bullhead City, AZ

Paint and Paint Supplies
Post-Bid
Tucson, AZ

Z--Replace Flooring
Results
Less than $25,000 est. value
Coolidge, AZ 85128

Bldg 20/21 Flooring
Results
Phoenix, AZ 85034

Painting Services
Post-Bid
$125,000 est. value
Tempe, AZ

Flooring at Commencement
Term Contract
Results
Tucson, AZ

Office Flooring Removal / Installation
Post-Bid
Glendale, AZ

Flooring Renovation for a Fire House/Fire Administration
Results
Payson, AZ 85541

Mechanical Work, Roof Repairs and Wood Flooring
Post-Bid
Ajo, AZ

Adult Detention Facility Kitchen Floor and Equipment Replacement
Results
Florence, AZ 85132

Interior Remodel of Module Buildings
Post-Bid
Window Rock, AZ

Tumbleweed Recreation Center Flooring
Results
Chandler, AZ 85286

Flooring at Alta Vista and Washington
Post-Bid
Phoenix, AZ 85051

Last Updated 05/08/2019 03:50 PM
Project Title

Men's and Women's Restroom Patch and Paint Walls, Resurface Floors Building L2120

Physical Address View project details and contacts
City, State (County) Casa Grande, AZ 85122   (Pinal County)
Category(s) Single Trades
Sub-Category(s) Flooring, Painting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Provide Patch and Paint of the walls and resurfacing of the floor in the men's and women's restrooms in Building L2120 located at 320 East Cottonwood Lane, Casa Grande, Arizona, 85122. 1. All the walls and ceiling in the restrooms shall have all damaged areas patched and repainted with a commercial grade, semi-gloss, PPG quality or better. 2. Color used shall be Swiss Coffee. 3. Floors shall be resurfaced as the coating is worn down to the cement and has numerous chips and chucks out of it in different areas. A portion of the floor in the Men's room has been repaired and will require some special treatment. 4.Floor surface shall be diamond ground and repaired as needed to ensure proper bond. 5.Surface preparation shall include a 2 part epoxy polyamide primer product or better. 6. Coating used shall be an industrial grade, high solids, solvent based, 2 part coating with an Aliphatic Urethane topcoat that is chemical resistant as a sealer to ensure durability under constant use and dry to a minimum total 10 mil thickness. 7. . Chips are to be spread on the surface to provide a non-slip surface. 8.Cracks and joints shall be caulked after the coating is applied and dry. 9. Caulk shall be an industrial, permanently elastic, self leveling, polyurethane sealant and applied at or below grade of the floor coating.
Details
Division 09 - Finishes, Flooring, Painting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents