Similar Projects
Installation of Drainage City Wide
Post-Bid
Woonsocket, RI

Pipes, Castings and Erosion Controls
Post-Bid
Coventry, RI 02816

Johnson Road Culvert Head Wall Replacement Project
Results
Less than $88,865 est. value
Foster, RI 02825

Repair of North Bulkhead at the Port of Galilee - Bond
Results
Providence, RI

Greenhouse Wash Water Management
Post-Bid
North Kingstown, RI 02852

Drainage Improvements to Opechee Drive, Alves Street and Berry Lane
Results
Bristol, RI 02809

Supply of Drainage Pipe
Post-Bid
Woonsocket, RI

Supply of Drainage Pipe
Results
Woonsocket, RI

High Density Polypropylene Pipe
Term Contract
Post-Bid
Warwick, RI

Independence Park Seawall Improvements
Results
Charlestown, RI

2019 Statewide Drainage Repairs, C-1
Results
Johnston, North Providence, RI

Sidewalk, Road and Drainage Construction
Term Contract
Results
Providence, RI

Design/Build for Replacing the S. Broadway 72" Diameter Steel Culvert
Results
East Providence, RI

High Density Polypropylene Pipe
Term Contract
Results
Warwick, RI

Drainage Improvements Putnam Pike
Results
Glocester, RI

Last Updated 01/13/2020 08:47 AM
Project Title

Drainage Improvements at Lugent Lane

Physical Address View project details and contacts
City, State (County) Bristol, RI 02809   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $62,334
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project pertains to the installation of a new drainage system at the eastern terminus of Lugent Lane and on private properties identified as AP 28, Lot 124 (41 Lugent Lane), and AP 48, Lot 42, as shown on the construction plan prepared by Caputo and Wick Ltd., dated October 25, 2019. The Contractor will be responsible for verifying the location of all utilities above and below the surface and obtaining a DigSafe permit. The project includes saw cutting existing bituminous pavement; removing and legally disposing existing bituminous pavement; excavating and installing new CPEP drainage pipe, drop inlets (2), solid-rim drain basin (1), open-grate drain basins (2), and pipe-end outlet protection; backfilling and compacting pipe trench with approved gravel borrow; reconstructing dry stone wall; installing temporary bituminous trench patch in Lugent Lane and driveway; installing bituminous berm; loaming and seeding; and any incidentals necessary to complete the project in accordance with the plans and specifications. After a suitable settlement period of approximately 60 days (or spring), the project requires saw cutting bituminous pavement in Lugent Lane (providing straight edges between drainage structures); removing the temporary bituminous trench patch in Lugent Lane; removing and disposing existing bituminous driveway pavement in its entirety, including driveway trench patch; regrading existing driveway to drain away from resident’s garage and towards new drain basins; installing new 2½” bituminous binder course and new 1½” surface course over Lugent Lane trench; and installing new 1½” bituminous binder course and new 1½” surface course over entire driveway.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents