Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Intersect Modif
Infrastructure
Design
$2,600,000 CJ est. value
Binger, OK 73009

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Pedestrian Improvements (Sidewalks) - US-62
Infrastructure
Bidding
$361,401 CJ est. value
Anadarko, OK 73005

Stephenson-Taylor Water Line Extension
Infrastructure
Post-Bid
$250,000 CJ est. value
Binger, OK 73009

Stephenson-Taylor Water Line Extension
Infrastructure
Post-Bid
$250,000 CJ est. value
Binger, OK 73009

Hinton Waterline Extension
Infrastructure
Results
$325,000 est. value
Hinton, OK

Waterline Relocation along SH-8
Term Contract
Results
Carnegie, OK

Utilities - SH 58
Infrastructure
Design
$600,000 CJ est. value
Carnegie, OK 73015

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Resurface, Bridge Rehabilitation, and Cable Barrier I-40
Infrastructure
Results
$12,998,630 CJ est. value
Hydro, OK 73048

Grade, Drain and Surface - SH 8
Infrastructure
Design
$11,925,000 CJ est. value
Gracemont, OK 73042

Old Caddo County Maintenance Yard UST Removal
Infrastructure
Post-Bid
$166,170 CJ est. value
Anadarko, OK 73005

Waterline Replacement
Infrastructure
Results
$933,848 CJ est. value
Fort Cobb, OK 73038

Bridge and Approaches - US 281
Infrastructure
Design
$15,874,343 CJ est. value
Gracemont, OK 73042

Last Updated 02/28/2023 03:09 AM
Project Title

SH 09 - Utilities

Physical Address View project details and contacts
City, State (County) Anadarko, OK 73005   (Caddo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $508,453 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SH-9: From Just E. Of the Stinking Cr. Bridge in Kiowa Co. E. 2.75 Mis. To the Sh 58 Jct. In Carnegie Ut for 21714(04) As of February 28, 2023, the project is in Final Planning status. Anticipated letting month/year is November, 2022. Length : 2.750 Mi OKDOT - SH 09 - Utilities *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents