Similar Projects
FY21 Stormwater Improvements
Bidding
Ayer, MA

Cleaning Storm Drains, Manholes and Catch Basins
Bidding
Danvers, MA

Clean/Television Inspection of Sewers Citywide
Post-Bid
Less than $550,000 est. value
Boston, MA

Repair, and Rebuilding Catch Basins and Manholes
Post-Bid
$150,000 est. value
Lowell, MA

Bayview Street Stormwater BMP Construction
Results
Less than $120,000 est. value
Yarmouth, MA

Stormwater Detention Basin Rehabilitation
Results
Less than $100,000 est. value
Tewksbury, MA 01876

Removal Transportation and Disposal of Storm Debris
Post-Bid
Less than $50,000 est. value
Yarmouth, MA

25 Bunker Road Drainage Infiltrator Replacement
Results
Less than $18,328 est. value
Nantucket, MA 02554

Southern New England Trunkline Trail - Prospect Street Underpass
Post-Bid
Less than $1,729,000 est. value
Franklin, MA

Catch Basin Cleaning Contract 2 Citywide
Results
Less than $550,000 est. value
Boston, MA

Colonial Acres Storm Water BMP
Post-Bid
Less than $190,000 est. value
South Yarmouth, West Yarmouth, MA 02673

Catch Basin Cleaning Contract 1
Results
Less than $550,000 est. value
Boston, MA

Storm Water System and Ancillary Piping
Post-Bid
Less than $45,000 est. value
Stow, MA 01775

Emergency Repairs to Sewers and Storm Drains Citywide
Results
Less than $1,500,000 est. value
Boston, MA

William Street Plaza Storm Line Replacement
Post-Bid
Less than $35,000 est. value
Pittsfield, MA 01201

Last Updated 03/03/2020 03:03 PM
Project Title

2020 Three Bays Stormwater Retrofit

Physical Address View project details and contacts
City, State (County) Cotuit, MA   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $360,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

2020 Three Bays Stormwater Retrofit Project in the Town of Barnstable, Massachusetts. The Project includes, but is not limited to, construction of stormwater management practices at three different sites including bioretention areas, leaching structures, dry swales, and a water quality structure, along with associated drainage connections and site amenities. The work at the Cotuit Library (CO-1) and Putnam Avenue (LR1-4) sites must be completed by June 30, 2020. Parking for the public must be maintained for the Cotuit Library. The Library must remain open to the public at all regularly scheduled times. Vehicular and pedestrian access as applicable must be maintained at the Putnam Ave (LR1-4) and South County Road (WC1-1) sites at all times. Work at the South County Road (WC1-1) site must be completed by December 1, 2020.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents