Similar Projects
Electric Transmission/Distribution Hardware Material
Term Contract
Bidding
Provo, UT 84606

400 HP Variable Frequency Drive Motor Controller and Harmonic Filter for New Well
Post-Bid
Springville, UT

Fine Arts Lighting 3
Post-Bid
Orem, UT

Tica Upgrade Electrical, Qtr 8
Results
American Fork, UT 84003

Fine Arts Theatrical Lighting
Term Contract
Results
Orem, UT

Phase 1 Street Lighting Project
Post-Bid
Orem, UT

Fine Arts Theatrical
Results
Orem, UT

Pad Mounted Transformers (Re Manufactured Only)
Term Contract
Post-Bid

DFCM Construction Pre-Qualified Electrical Contractors UVU Concourse Lighting Upgrade
Results
Less than $205,000 est. value
Orem, UT 84058

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

Fine Arts Theatrical Lighting 2
Results
Orem, UT

Eaton UPS Equipment
Post-Bid
Orem, UT 84058

Lehi Power Substation Transformers
Results
Lehi, UT

Generator Project
Post-Bid
Saratoga Springs, UT

State Hospital Substation Upgrade
Results
Less than $1,576,000 est. value
Provo, UT

Last Updated 09/19/2019 02:09 PM
Project Title

Alpine School District Three School Rewire

Physical Address View project details and contacts
City, State (County) Pleasant Grove, UT   (Utah County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Qualified firms for the network infrastructure rewire of three schools as per attached specifications. Mention of any brands, equipment, part number, etc.
Details
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents