Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Rock Creek Campus Kennel AHU Replacement
New Construction
Bidding
Portland, OR 97229

On-Call and Emergency Mechanical and HVAC Services
Term Contract
Bidding
Less than $50,000 est. value
Redmond, OR

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Ashland Library HVAC Equipment Upgrade
Alteration
Bidding
Ashland, OR 97520

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

Jail HVAC Upgrade
Alteration
Bidding
Salem, OR 97317

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Design-Build for Mechanical or HVAC
Alteration
Results
Springfield, OR 97477

North Fish Ladder HVAC
Alteration
Bidding
Rufus, OR 97050

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

Reported 03/17/2022 12:00 AM
Project Title

Central Middle School HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Milton-Freewater, OR 97862   (Umatilla County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall include Mechanical, Electrical, and Controls as separate contracts. Demolition consists of removing the existing air handler, associated main ducting, and portions of the existing masonry plenum. The new air handlers will be installed exterior to the building and ducted into a newly fabricated multi-zone hot and cold deck plenum with associated dampers and controls. All new equipment to receive a new 460-volt power infrastructure.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents