Similar Projects
Main Library Chiller and Related Equipment
Bidding
Less than $100,000 est. value
Newton, MA

Air Source Heat Pumps in City Hall
Bidding
Less than $70,000 est. value
Woburn, MA 01801

Construction of New 140,000 SF Elementary School Building - Filed Sub-Bid
New Construction - 140,000 SF
Sub-Bidding
Less than $77,500,000 est. value
Tewksbury, MA

IT Upgrades, Ball Hall - Filed Sub-Bids
Sub-Bidding
Less than $450,000 est. value
Lowell, MA 01854

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

City Hall Heat Pump Replacement - General Bids
Post-Bid
$410,000 est. value
Marlborough, MA

Harvey Wheeler Community Center Air Handler Unit (AHU) Replacement - General Bids
Results
$175,000 est. value
Concord, MA 01742

Olney Hall Room 512 Lab Renovation - Filed Sub-Bid
Results
Less than $365,000 est. value
Lowell, MA

Gymnasium AHU Retrofit, Abbot Elementary School
Bidding
$190,000 est. value
Westford, MA

Harvey Wheeler Community Center - Air Handling Unit (AHU) Replacement
Post-Bid
Less than $175,000 est. value
Concord, MA

Robert W. Healy Public Safety Building - Rooftop and Dry Cooler Replacement - General Bid
Results
Less than $2,998,500 est. value
Cambridge, MA

HVAC Repair Service Contract/Various Buildings
Term Contract
Bidding
Arlington, MA

Repair AHU-1 Fan Shaft B1606
Post-Bid
Bedford, MA 01731

North Campus Steam Improvements
Results
$1,000,000 est. value
Lowell, MA

J041--Inspect and Clean Ductwork. Bedford VAMC
Bidding
Bedford, MA 01730

Last Updated 02/08/2019 02:53 PM
Project Title

HVAC Design Framingham High School

Physical Address View project details and contacts
City, State (County) Framingham, MA   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,178,277
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Construction oversight for the addition of a new cooling system for the Framingham High School by adding air-conditioning in areas which are presently not cooled. Project includes studying the addition of a new chiller and cooling tower to support the existing fan coil systems.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents