Similar Projects
Weirs Fire Department Bathroom and Kitchen Renovations Project
Renovation
Results
Laconia, NH 03246

Belmont Police Department
New Construction - 8,500 SF
Post-Bid
Belmont, NH 03220

Construction Management Services, New Construction Project, Tuftonboro Police Station
New Construction - 5,000 SF
Results
Less than $1,740,000 est. value
Tuftonboro, NH

New Police Building Construction
New Construction - 5,000 SF
Post-Bid
Tuftonboro, NH 03816

Berlin Fire Station
Renovation
Results
$250,000 to $300,000 est. value
Berlin, NH 03570

Renovations to Fire Stations
Renovation
Results
Merrimack, NH 03054

Fire Station 9 Replacement
New Construction - 10,000 SF
Design
Manchester, NH

Fire Department Hall Project
Results
Epsom, NH 03234

Patrol Room Project
Results
Allenstown, NH 03275

Central Fire Station Bathrooms and Kitchen Renovations
Results
Portsmouth, NH 03801

Design Build Services Deerfield Police Station
New Construction - 7,400 SF
Results
Less than $2,000,000 est. value
Deerfield, NH 03037

Construction Management Services - New Central Fire Station
Results
Somersworth, NH 03878

UNH Service Building - Renovations/Improvements for Durham Fire Department
Renovation
Results
Durham, NH 03824

Last Updated 02/10/2022 10:30 AM
Project Title

Construction Managers for Replacement of the Existing Fire Station

Physical Address View project details and contacts
City, State (County) Manchester, NH 03103   (Hillsborough County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is the replacement of the existing fire station #9, located at 575 Calef Road. The structure will be razed and replaced with a new and modern fire station to serve the Manchester community. The successful C/M firm will be expected to perform a thorough evaluation of the new design programs and participate as a team member assisting the Architect and the Owner ultimately for the construction of a new fire station which accomplishes the purpose.

Details

Fire/Police Station, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents