Similar Projects
Last Updated | 07/05/2023 04:17 PM |
Project Title | Filter No. 11 Rehabilitation Draper Water Treatment Plant |
Physical Address | View project details and contacts |
City, State (County) | Oklahoma City, OK 73165 (Cleveland County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $688,788 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work consists of construction of Filter No. 11 Rehabilitation, including the described work, and incidentals for complete and usable facility: 1. Filter No. 11: a. Demolition/ Removal and off-site disposal of existing filter media, and underdrain system. b. Installation, testing, disinfection and commissioning of new underdrain system, filter media and media retention caps: 1) Materials for new underdrains, filter media and media retention caps are provided by Owner. Installation of new media retention caps shall follow manufacturer's instructions. The bill of materials for all Owner provided equipment and materials is included in the attachments to this section. 2) Following demolition, Owner, Engineer, and Contractor shall provide two (2) weeks' notice prior to inspection of filter bays and determine type of and quantity of concrete repairs (if any) as indicated on the unit price portion of the bid form and specified herein. 3) Contractor shall be responsible to provide any and all materials (i.e. grout, epoxy system for anchors, etc.), equipment, and labor as required to integrate the Owner provided materials to provide a complete and working underdrain system as specified herein. (i.e. grout, epoxy system for anchors, etc.). 4) Contractor shall be responsible to provide manufacturers field services during installation, testing, and commissioning of the filter No. 11 underdrain system and media retention cap Assignment of procurement contract provided in Amendment No. 1 to the Contract. c. Installation, testing, disinfection, and commissioning of filter media: 1) Filter media for Filter 11 to be provided by Owner and are currently on-site in storage supersacs. 2) Contractor shall be responsible to install, test, disinfect and commission media as specified herein. 2. Concrete Repairs: a. As identified during demolition operations, Owner, Contractor, and Engineer will agree on any existing conditions which require repair. All concrete repairs will be performed by the contractor in accordance with the specifications, however, concrete repairs made necessary by action of the Contractor shall be considered outside the scope of work will not receive payment. Question Deadline 05/26/2023 at 10:00 AM CT |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |