Similar Projects
Martin Luther King, Jr. Boulevard Sidepath - 508-122 - City of Baltimore
Infrastructure
Conception
$868,000 CJ est. value
Baltimore, MD 21201

Martin Luther King, Jr. Boulevard Sidepath - 508-122 - City of Baltimore
Infrastructure
Conception
$868,000 CJ est. value
Baltimore, MD 21201

Harlem Park Apartments Renovation and Addition
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Baltimore, MD 21223

Harford Road Multi-Residential / Baltimore
New Construction, Infrastructure
Design
$56,000,000 CJ est. value
Baltimore, MD 21214

Environmental Restoration Project 15
Infrastructure
Bidding
$2,500,000 CJ est. value
Baltimore, MD 21202

Surface Abrasion and Diamond Grinding of Roadways at Various Locations Statewide
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value

HC Properties Phase I - Plan A and Plan B
Build-out, Infrastructure - 94,412 SF
Post-Bid
$10,000,000 CJ est. value
Baltimore, MD 21230

Airfield Lighting Vault Relocation at BWI Thurgood Marshall Airport
Infrastructure, Renovation
Results
$23,997,000 CJ est. value
Baltimore, MD 21202

Airfield Lighting Vault Relocation at BWI Thurgood Marshall Airport
Infrastructure, Renovation
Results
$23,997,000 CJ est. value
Baltimore, MD 21202

RFQ D/B - Howard Street Tunnel Project
New Construction, Infrastructure
Construction
$466,000,000 CJ est. value
Baltimore, MD 21217

Monroe Circle Multi Family Buildings
New Construction, Infrastructure
Construction
$3,000,000 CJ est. value
Baltimore, MD 21225

North Avenue Mixed-Use Development / Baltimore
New Construction, Infrastructure - 41,450 SF
Pending Verification
$200,000,000 CJ est. value
Baltimore, MD 21217

Plant 83
Demolition, New Construction, Infrastructure - 100,000 SF
Pending Verification
$20,000,000 CJ est. value
Baltimore, MD 21211

Metro West/Route 40 Street Realignment - 601-096 - City of Baltimore
Infrastructure
Conception
$1,000,000 CJ est. value
Baltimore, MD 21202

The Promenade at Catonsville
New Construction, Infrastructure - 1,100,000 SF
Design
$300,000,000 CJ est. value
Baltimore, MD 21224

Last Updated 09/28/2023 10:10 AM
Project Title

Summit Park Elementary School - Replacement School

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21209   (Baltimore City County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2022
Bids Due View project details and contacts
Estimated Value $45,708,351 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. Package 01A - General Trades: Overall MBE goal of 29% of the total contract value Subgoal of 8% from certified African American-owned businesses Subgoal of 11% from certified Women-owned businesses 2. Package 01B - Testing & Inspection: Overall MBE goal of 5% of the total contract value Subgoal of 0% from certified African American-owned businesses Subgoal of 0% from certified Women-owned businesses 3. Package 02A - Site Work: Overall MBE goal of 28% of the total contract value Subgoal of 8% from certified African American-owned businesses Subgoal of 11% from certified Women-owned businesses 4. Package 03A - Concrete: Overall MBE goal of 22% of the total contract value Subgoal of 0% from certified African American-owned businesses Subgoal of 0% from certified Women-owned businesses 5. Package 04A - Masonry: Overall MBE goal of 24% of the total contract value Subgoal of 0% from certified African American-owned businesses Subgoal of 0% from certified Women-owned businesses 6. Package 05A - Steel: Overall MBE goal of 25% of the total contract value Subgoal of 0% from certified African American-owned businesses Subgoal of 0% from certified Women-owned businesses 7. Package 07A - Roofing: Overall MBE goal of 25% of the total contract value Subgoal of 0% from certified African American-owned businesses Subgoal of 0% from certified Women-owned businesses 8. Package 08A - Openings: Overall MBE goal of 22% of the total contract value Subgoal of 0% from certified African American-owned businesses Subgoal of 0% from certified Women-owned businesses 9. Package 09A - Drywall: Overall MBE goal of 25% of the total contract value Subgoal of 0% from certified African American-owned businesses Subgoal of 0% from certified Women-owned businesses 10. Package 09B - Flooring: Overall MBE goal of 22% of the total contract value Subgoal of 0% from certified African American-owned businesses Subgoal of 0% from certified Women-owned businesses 11. Package 09C - Painting: Overall MBE goal of 22% of the total contract value Subgoal of 0% from certified African American-owned businesses Subgoal of 0% from certified Women-owned businesses 12. Package 11A - Food Service Equipment: Overall MBE goal of 0% of the total contract value Subgoal of 0% from certified African American-owned businesses Subgoal of 0% from certified Women-owned businesses 13. Package 15A - Plumbing HVAC: Overall MBE goal of 29% of the total contract value Subgoal of 8% from certified African American-owned businesses Subgoal of 11% from certified Women-owned businesses 14. Package 16A - Electrical: Overall MBE goal of 29% of the total contract value Subgoal of 8% from certified African American-owned businesses Subgoal of 11% from certified Women-owned businesses 1 01A - General Trades: Cost Group E ($2,500,000 - $5,000,000) 2 01B - Testing & Inspections: Cost Group B ($100,000 - $500,000) 3 02A - Sitework: Cost Group F ($5,000,000 - $10,000,000) 4 03A - Concrete: Cost Group D ($1,000,000 - $2,500,000) 5 04A - Masonry: Cost Group E ($2,500,000 - $5,000,000) 6 05A - Steel: Cost Group E ($2,500,000 - $5,000,000) 7 07A - Roofing: Cost Group D ($1,000,000 - $2,500,000) 8 08A - Openings: Cost Group C ($500,000 - $1,000,000) 9 09A - Drywall & Acoustics: Cost Group D ($1,000,000 - $2,500,000) 10 09B - Flooring: Cost Group C ($500,000 - $1,000,000) 11 09C - Painting: Cost Group B ($100,000 - $500,000) 12 11A - Food Service Equipment: Cost Group B ($100,000 - $500,000) 13 15A - Mechanical, Plumbing & Fire Suppression: Cost Group F ($5,000,000 - $10,000,000) 14 16A - Electrical & Low Voltage: Cost Group E ($2,500,000 - $5,000,000) All prime contractors, including certified MBE firms, when submitting bids or proposals as general or prime contractors, are required to attempt to achieve this goal from certified MBE firms. The subgoals established for this project are as stated above.as stated above. Any MBE firms bidding should review the provisions in COMAR 21.11.03.12-1 for counting a portion of self-performance toward meeting the stated goals. The bidder or offeror is required to submit with its bid or proposal a completed Attachment A - Certified MBE Utilization and Fair Solicitation Affidavit and Attachment B - MBE Participation Schedule, as described in the solicitation documents. The tentative date for notice to proceed is March 2022. Work shall be completed as noted in the specifications. Major cleaning (Section 017400) is required before fall opening in 2023. Project was awarded to these following bidders: Package 01A General Trades: Homewood General Contractors, Inc in the amount of $3,818,000 Package 01B Testing & Inspections: Stevenson Consulting Inc in the amount of $131,751 Package 02A Sitework: Urban N. Zink Contractor, Inc in the amount of $8,043,300 Package 03A Concrete: Chevy Chase Contractors, Inc. in the amount of $1,474,000 Package 04A Masonry: KaRon Masonry of Maryland, Inc. in the amount of $3,727,000 Package 05A Steel: S.A. Halac Iron Works, Inc. in the amount of $5,990,000 Package 07A Roofing: CitiRoof Corporation in the amount of $2,631,700 Package 08A Openings: Glass Industries, LLC. in the amount of $1,248,000 Package 09A Drywall & Acoustics: J A Argetakis Contracting Co., Inc in the amount of $2,378,000 Package 09B Flooring: L&R Floors in the amount of $803,500 Package 09C Painting: J A Argetakis Contracting Co., Inc in the amount of $384,000 Package 11A Food Service Equipment: 11400 Inc. in the amount of $296,100 Package 15A Mechanical, Plumbing & Fire Suppression: Heer Brothers, Inc. in the amount of $9,400,000 Package 16A Electrical & Low Voltage: Action Electrical Contractors, Inc in the amount of $5,383,000

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents